• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, May 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Nasan Energies takes over divested Engen and Shell service stations

    Nasan Energies takes over divested Engen and Shell service stations

    TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

    Impact sheds South African assets to focus on Namibia’s Venus project

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Namibia turning explorers into market winners, says FitzGerald

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Namibia’s next multi-mineral growth province

    Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    Midas Minerals prepares to transition copper assets to full scale drilling

    Midas sells Australian project to invest in Otavi Copper-Gold Project

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    Kavango West-1X

    ReconAfrica secures permits for Kavango West oil flow testing in Namibia

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas Minerals hits 46.2m at 4.01% copper equivalent at Otavi’s T-13 deposit

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Connected Minerals reports strong uranium grades continue at Etango North-East

by Editor
October 21, 2025
in Uranium
0
Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect
512
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Connected Minerals Limited (ASX:CML) has reported further encouraging uranium results from Phase Two reverse-circulation drilling at its Etango North-East Project in Namibia, confirming consistent economic grades and broad mineralised zones similar to those seen in earlier work.

The latest campaign, completed at the Ondapanda Prospect, comprised 23 holes totalling 3,134 metres. According to the company, 17 holes—about 80 percent—returned economic uranium grades, reinforcing geological continuity first demonstrated in Phase One.

 In hole OPRC0020, drilling cut three metres at 265 parts per million equivalent uranium oxide (eU₃O₈) from 34 metres, including one metre at 435 parts per million, and a further six metres at 295 parts per million from 42 metres, including two metres at 485 parts per million.

Hole OPRC0024 produced two metres at 467 parts per million from 14 metres, including one metre at 635 parts per million, and twelve metres at 190 parts per million from 141 metres, including four metres at 302 parts per million.

Hole OPRC0035 returned four metres at 456 parts per million from 36 metres, including one metre at 716 parts per million.

Hole OPRC0016 delivered eight metres at 199 parts per million from 66 metres, including four metres at 300 parts per million and one metre at 446 parts per million.

Hole OPRC0017 intersected five metres at 249 parts per million from 33 metres, including one metre at 479 parts per million.

Managing Director Warrick Clent said the shallow nature of many of the higher-grade hits was particularly encouraging.

He noted that the results from Phase Two continued to impress, with over 80 percent of all holes drilled in both phases returning economic uranium grades.

Several holes, he said, showed multiple high-grade intersections, confirming the continued presence of stacked and mineralised Alaskite units.

Clent added that these findings strengthen the company’s view that the Etango North-East deposit follows the geological model of Bannerman Energy’s nearby Etango Project.

The company’s geologists reported that the central zone of Ondapanda yielded the broadest and richest intersections, including hole OPRC0038, which recorded 18 metres at 209 parts per million eU₃O₈ from one metre depth, the broadest mineralised interval drilled to date. Drilling in the western portion also intersected promising zones that will be targeted in follow-up work.

Connected Minerals said mineralisation at Etango North-East remains open at depth and along strike, and planning is under way for the next exploration phase.

The technical team confirmed that both drilling programmes intersected multiple stacked Alaskite bodies, reinforcing strong geological similarities with Bannerman Energy’s world-class Etango deposit, located within the same uranium province.

Clent added that upcoming work will focus on infill and step-out drilling to define resource potential and guide future development planning.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Nasan Energies takes over divested Engen and Shell service stations

Nasan Energies takes over divested Engen and Shell service stations

May 27, 2026
TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

Impact sheds South African assets to focus on Namibia’s Venus project

May 26, 2026
Kaoko Metals launches IPO to fund copper exploration in northern Namibia

Namibia turning explorers into market winners, says FitzGerald

May 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In