• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, November 26, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    50 cyclists to race through Otjihase copper mine’s underground tunnels

    50 cyclists to race through Otjihase copper mine’s underground tunnels

    BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    Celsius Resources progresses Opuwo Cobalt Project disposal plans

    Bank of Namibia grants conditional approval for US$15m Opuwo cobalt project sale

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Namibia mining output falls 17% as Chamber warns of further contraction

    Namibia mining output falls 17% as Chamber warns of further contraction

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

US$18b Venus project creates opportunities before first oil

by Editor
July 23, 2026
in Oil & Gas
0
US$18b Venus project creates opportunities before first oil
530
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

NAMCOR Executive for Upstream Development and Production, Mtundeni Ndafyaalako, says the estimated US$18 billion expected to be invested in the development and operation of the Venus oil field is already creating opportunities for Namibians, even before the country produces its first barrel of oil.

Speaking at the 3rd Youth in Oil & Gas Summit in Walvis Bay, where NAMCOR was the official National Oil Company partner, Ndafyaalako said the focus should now shift from celebrating discoveries to preparing Namibians to participate in the country’s emerging petroleum industry.

“Opportunity will not wait for first oil. Opportunity is being created right now, in the readiness phase,” he said.

Ndafyaalako said Namibia’s oil and gas sector was entering a new phase as the proposed Venus development moved closer to a final investment decision (FID).

He said the project is expected to generate about US$11 billion in development investment, with a further US$7 billion projected to be spent on operations over the life of the project.

According to Ndafyaalako, more than US$2 billion has already been spent within Namibia, with expenditure spread across the Erongo, Khomas and Kharas regions, demonstrating that economic benefits are already flowing into the local economy during the pre-development stage.

He said the project is expected to create around 5,000 jobs during construction and a further 7,000 jobs during the development phase, while efforts are under way to increase Namibian participation in the workforce.

Ndafyaalako said direct employment on the project is expected to become increasingly localised, with the proportion of Namibians targeted to rise from 50% to 90% as the industry develops.

To support that objective, he said the Venus Academy, scheduled to be commissioned in the first quarter of 2029, will train and certify Namibians to internationally recognised industry standards, equipping them for employment across the petroleum value chain.

He stressed that local content should not be viewed as preferential treatment but as something earned through skills and performance.

“Local content is not a gift and it is not a quota. It is built on competence, compliance and commitment,” he said.

Addressing young Namibians, Ndafyaalako urged them to prepare themselves for the opportunities emerging from the country’s offshore petroleum discoveries.

“To the youth of Namibia, this resource endowment belongs to your generation. Come prepared,” he said.

His remarks come as Namibia moves closer to the development of the giant Venus discovery in the Orange Basin, with the industry increasingly turning its attention from exploration towards project execution, workforce development and building local capacity ahead of first oil.

Share212Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
50 cyclists to race through Otjihase copper mine’s underground tunnels

50 cyclists to race through Otjihase copper mine’s underground tunnels

November 26, 2026

BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

November 26, 2026
ReconAfrica in talks to terminate NAMCOR stake acquisition

ReconAfrica in talks to terminate NAMCOR stake acquisition

November 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe