• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, November 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Namibia mining output falls 17% as Chamber warns of further contraction

    Namibia mining output falls 17% as Chamber warns of further contraction

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

    Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

    Haib placed third among major low-grade copper producers

    Haib placed third among major low-grade copper producers

    Okavango Diamond Company earns US$645 million from Botswana diamond sales

    Okavango Diamond Company earns US$645 million from Botswana diamond sales

    Jacaranda reports A$7.3 million cash to fund Botswana gold exploration

    Jacaranda reports A$7.3 million cash to fund Botswana gold exploration

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Giyani secures US$2.5m for K.Hill manganese project in Botswana

by Editor
November 23, 2026
in News
0
Giyani secures US$2.5m for K.Hill manganese project in Botswana
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Giyani Metals has secured an additional US$2.5 million in loan facilities from South Africa’s Industrial Development Corporation (IDC) to advance its K.Hill battery-grade manganese project in Botswana towards a final investment decision in the second half of 2027.

The Canadian-listed company announced on 23 November 2026 that it had signed a third amendment to its existing convertible loan agreements with the IDC, increasing the combined facility ceiling from R329.9 million to R372.4 million.

The agreement also extends key project milestones, including the deadline for a final investment decision, to 31 December 2027, giving Giyani additional time to complete technical studies and secure financing for the proposed development.

The additional funding comprises up to US$2 million for Giyani Metals South Africa and US$500,000 for Menzi Battery Metals, subject to respective ceilings of R34 million and R8.5 million.

Giyani said the agreement’s suspensive condition had been satisfied, although final acceptance from the TSX Venture Exchange remains outstanding.

The new facilities will support technical work and financing preparations rather than construction of the proposed mine and processing operation.

Further testing before investment decision

Giyani plans to undertake additional technical studies to improve the economics of K.Hill, building on its definitive feasibility study completed in May and filed with Canadian securities regulators in July 2026.

The programme will include trade-off and optimisation studies to identify opportunities to improve the project’s processing arrangements and financial performance.

The company will also conduct a targeted pilot plant campaign using experience gained from its existing demonstration plant.

The campaign is intended to validate selected processing stages, generate engineering data and produce additional quantities of high-purity manganese oxide (HPMO) and high-purity manganese sulphate monohydrate (HPMSM).

These products will be supplied to prospective customers for testing and qualification as Giyani continues discussions with potential buyers in the United States, Europe, Africa and Asia outside China.

High-purity manganese products are used in materials for electric vehicle batteries and energy storage systems.

The additional testing is intended to support both customer qualification and the detailed engineering required before Giyani can commit to developing the project.

According to the company, its definitive feasibility study estimated K.Hill’s net present value at US$482 million using an 8% discount rate, with a post-tax internal rate of return of 20.3%.

These figures are feasibility study estimates rather than realised returns, and the project remains subject to financing and a final investment decision.

The amended financing agreement also provides for discussions about a possible increase in the IDC’s ownership of the company holding the K.Hill project.

Under the agreement, Giyani has undertaken to negotiate in good faith, if requested by the IDC, an increase in the institution’s aggregate shareholding in Thabatala Holdings from above 25% to a maximum of 30%.

However, Giyani emphasised that there is no obligation to agree to an increased shareholding.

Any change would require a separate written agreement and the necessary corporate, securities and stock exchange approvals.

The amendment also requires additional Botswana tax and legal advice relating to the IDC’s potential conversion of its investment into shares and shareholder loans in the project holding company.

The arrangement highlights the IDC’s continuing involvement in financing K.Hill, although the final ownership structure has not been settled.

Short-term borrowing adds pressure

Giyani also disclosed further details of a US$250,000 bridge loan obtained from ARCH Sustainable Resources Fund in September to meet short-term working capital requirements and project costs.

The facility has been fully drawn and is repayable on 23 January 2027 unless ARCH agrees to an extension.

The loan is interest-free for the first 60 days after the initial drawdown, after which interest applies retrospectively at the Secured Overnight Financing Rate plus 10% annually.

An arrangement fee equivalent to 10% of the amount borrowed is also added to the principal.

The agreement requires Menzi Battery Metals to repay the bridge loan immediately from the proceeds of any investment received.

It also obliges Menzi to establish an environmental, social and governance committee and adopt an ESG charter acceptable to ARCH by 24 December 2026.

Failure to meet that requirement would trigger an additional fee equal to the principal amount drawn.

ARCH owns approximately 18.1% of Giyani’s issued shares and has a representative on its board, making the bridge loan a related-party transaction.

Giyani said its board approved the arrangement and that no director expressed a materially contrary view.

Despite the additional IDC facilities, Giyani has not secured all the financing required to advance K.Hill through development.

The company said it remained in discussions with financial institutions, primarily in Southern Africa, including existing investors IDC and ARCH, to secure funding through to a final investment decision.

It cautioned that these discussions do not constitute binding financing commitments and remain subject to due diligence, investment approvals and the negotiation of definitive agreements.

Interim executive chair Nigel Robinson welcomed the continued support of the two investors.

“We are delighted that the IDC and ARCH have agreed to follow their earlier investments in Giyani and we are very grateful to both for their ongoing support,” Robinson said.

He described their commitment as an endorsement of the project’s potential and said discussions with other strategic financing partners were continuing.

The company also plans to appoint a new chief executive officer and strengthen its business development and investor relations activities as it prepares for the investment decision.

Separately, Giyani announced that it would move to semi-annual financial reporting under an exemption available to qualifying Canadian venture issuers, reducing its reporting frequency and associated administrative costs.

It also agreed to settle C$97,500 in consulting fees owed to UBK Africa Consulting Services through the issue of 1,201,542 shares, subject to exchange approval.

The immediate priority remains securing sufficient funding to complete the technical and financing work needed for K.Hill’s final investment decision.

While the additional US$2.5 million provides support for the next stage of development, Giyani acknowledged that further financing will be necessary and that there is no assurance the remaining funding will be secured or the planned milestones achieved.

Share196Tweet123
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Giyani secures US$2.5m for K.Hill manganese project in Botswana

Giyani secures US$2.5m for K.Hill manganese project in Botswana

November 23, 2026
Tsodilo secures two-year renewal for Gcwihaba rare earth project in Botswana

Tsodilo secures two-year renewal for Gcwihaba rare earth project in Botswana

November 23, 2026
Namibia mining output falls 17% as Chamber warns of further contraction

Namibia mining output falls 17% as Chamber warns of further contraction

November 23, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe