• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, June 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Arkle set to drill after confirming uranium across Erongo targets

    Arkle set to drill after confirming uranium across Erongo targets

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Investment

Andrada Mining secures N$175m funding from Bank Windhoek

by Editor
March 19, 2024
in Investment
0
Andrada anticipates tin concentrate production to increase from 1.500 to 2.600 tpa
551
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining Limited has entered a conditional, credit-approved N$175 million funding agreement with Bank Windhoek Limited.

If completed, Andrada Mining says these facilities will replace Uis Tin Mining Company (UTMC)’s current banking facilities of N$111.3 million. 

In addition, Andrada Mining says the intention is for Bank Windhoek to refinance the company’s working capital facilities, totalling N$50 million. 

These facilities, which are for 12 months from the drawdown date, will incur the prime rate minus 0.5%, resulting in a total rate of 11%. 

According to Andrada Mining, a mechanism is in place to mitigate the impact of the prime rate decreases on the facility’s interest rate to 

ensures the facility rate remains materially unchanged. 

As part of the lending facilities, Andrada Mining has also agreed to headline terms for short-term loan facilities of N$15 million (approximately GBP 0.63 million) for use as cash flow against future VAT payments. 

The short-term loan will be provided for 12 months and incur the Prime rate. Any drawdowns under the short-term loan will be repaid to the bank upon receipt of refunds from the Namibia Revenue Agency.

In addition to the lending facilities, Bank Windhoek intends to provide AfriTin Mining with a N$10 million (approximately GBP 0.42 million) guarantee to Namibia Power Corporation Pty Limited in relation to a deposit for the right to supply electrical power. 

Bank Windhoek has also indicated interest in funding the construction of a 5MW solar plant at Uis. 

Andrada Mining directors say although this is still early, they consider supporting the company’s wider objectives indicative of a successful, collaborative future relationship.

Andrada Mining CEO Anthony Viljoen says this comprehensive agreement aligns perfectly with the company’s current and future funding needs. 

“The increased cash flow should empower us to execute key operational decisions. Notably, the improved working capital facility will better support our yearly production increases. We look forward to executing final documentation and entering into a collaborative relationship as we achieve our ambitious growth plans,” Viljoen says.

Share220Tweet138
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

June 26, 2026
Aldoro secures funding and new drill rig for expanded Kameelburg program

Aldoro prepares for resource update after intersecting a record 542.9m at 1.38% TREO at Kameelburg

June 26, 2026
Arkle set to drill after confirming uranium across Erongo targets

Arkle set to drill after confirming uranium across Erongo targets

June 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In