• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, November 18, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Khama warns Botswana could wait years for De Beers dividends

    Khama warns Botswana could wait years for De Beers dividends

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow blames weak share price for Tumas uranium delay

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Impact Oil & Gas pays Africa Oil US$31.6 million dividend from TotalEnergies Orange Basin farm-down deal

    Impact separates South African assets to concentrate on Namibia’s Venus oil project

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    NDP6 – Five mines to power a nuclear future by 2030

    Bannerman reserves 40% of Etango uranium for buyers outside Chinese partnership

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

African Pioneer and Chinese partner plan four-rig drilling push at Ongombo

by Editor
September 3, 2026
in Copper
0
African Pioneer and Chinese partner plan four-rig drilling push at Ongombo
513
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

African Pioneer is preparing to deploy up to four diamond drill rigs across its Ongombo and Ongeama copper projects in Namibia as the company and its Chinese development partner move towards final mine design and an updated resource at Ongombo.

The planned multi-month drilling programme will be split between the two projects and is intended to generate geotechnical information required for final open-pit and underground mine designs, while also providing data to update Ongombo’s current 29 million tonnes at 1.1% copper equivalent JORC mineral resource.

African Pioneer said drilling will begin once regulatory requirements are complete and the company and its development partner, Hong Kong Xinhai Mining Services Limited, have agreed on final drill-hole locations and depths.

The programme marks another step in developing the copper projects, following a financing and technical services agreement African Pioneer and Xinhai signed in July.

Under that agreement, Xinhai is expected to fund agreed development milestones covering drilling, engineering, construction and commissioning as African Pioneer seeks to move Ongombo towards production.

African Pioneer previously estimated the four development stages covered by the arrangement at approximately US$60 million.

The first milestone provides funding for an aggregate 7,000 metres of drilling at Ongombo and Ongeama.

The second covers detailed engineering design for Ongombo, while the third includes delivery of construction equipment to Walvis Bay and an additional 3,000 metres of drilling at Ongeama if the initial results justify further work.

The fourth milestone targets commercial operations at more than 75% of the design capacity of a processing plant of at least 720,000 tonnes per year for 30 consecutive days, together with the first phase of underground decline development at Ongombo.

The latest drilling programme is therefore intended to provide information needed to move the project through those development stages.

African Pioneer said discussions with Xinhai are also under way to determine the final mine design and processing plant throughput for the combined Ongombo-Ongeama development.

The company will need additional technical personnel in Namibia to manage the volume of drill core expected from as many as four rigs, and recruitment is already under way through its local management team.

The drilling itself is expected to run for several months, followed by an additional period while final laboratory assays are received.

Ongombo currently hosts a JORC mineral resource of 29 million tonnes at 1.1% copper equivalent.

Within that resource, previous work identified an indicated resource of 5.7 million tonnes at 1.1% copper equivalent, comprising 0.94% copper, 4.4 grams per tonne silver and 0.23 grams per tonne gold.

About 0.93 million tonnes of that resource was previously considered potentially open-pittable.

A subsequent mine optimisation study identified an open-pit resource of about 1.05 million tonnes grading 1.33% copper, 0.17 grams per tonne gold and 6.3 grams per tonne silver.

African Pioneer has also identified an undrilled extension northeast of the existing open-pit outline that it believes could potentially add around one million tonnes of open-pittable mineralisation. However, further drilling is required to establish whether that potential can be converted into a mineral resource.

Ongeama, meanwhile, hosts mineralisation similar to Ongombo and has returned higher gold grades in some historical drilling. African Pioneer has identified near-surface mineralised lenses that could potentially provide additional open-pit resources.

The company is therefore using the new drilling programme to improve confidence in the existing Ongombo resource and determine what Ongeama could contribute to a combined development.

African Pioneer chairperson Colin Bird said planning for the drilling programme was progressing rapidly and pointed to Xinhai’s commitment to a significant short-term drilling campaign.

Administrative processes relating to outstanding conditions under the July financing and development agreement are still being finalised.

African Pioneer said it will announce when those conditions have been completed.

Ongombo and Ongeama are situated in central Namibia, approximately 30 kilometres from Windhoek, giving the projects access to existing infrastructure as African Pioneer works towards a development decision.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

November 18, 2026
Namibia showcases US$212m industrial projects at COP31

Namibia showcases US$212m industrial projects at COP31

November 18, 2026
Khama warns Botswana could wait years for De Beers dividends

Khama warns Botswana could wait years for De Beers dividends

November 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe