• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, November 18, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Khama warns Botswana could wait years for De Beers dividends

    Khama warns Botswana could wait years for De Beers dividends

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow blames weak share price for Tumas uranium delay

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Impact Oil & Gas pays Africa Oil US$31.6 million dividend from TotalEnergies Orange Basin farm-down deal

    Impact separates South African assets to concentrate on Namibia’s Venus oil project

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    NDP6 – Five mines to power a nuclear future by 2030

    Bannerman reserves 40% of Etango uranium for buyers outside Chinese partnership

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Green Hydrogen

Namibia showcases US$212m industrial projects at COP31

by Editor
November 18, 2026
in Green Hydrogen
0
Namibia showcases US$212m industrial projects at COP31
495
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Namibia has presented three proposed mineral processing and manufacturing projects valued at a combined US$212 million at the COP31 climate conference, highlighting plans to establish a manganese refinery, an industrial chemicals plant and a ceramics factory as part of efforts to expand domestic manufacturing and attract climate-related investment.

The projects were outlined in the Namibia Green Hydrogen Programme’s November 2026 Green Industries Reference Pipeline presentation, which identified investment opportunities across green fuels, mining, mineral processing and manufacturing.

Green Metals Refining is proposing a US$109 million first-phase investment in a battery-grade manganese sulphate refinery and associated sulphuric acid plant, while Green Brine Technologies has identified a US$62 million project to convert desalination brine into industrial chemicals.

Namib Industry Ceramics is proposing a US$41 million factory to manufacture ceramics and construction materials using renewable biomass.

The three developments have been classified as conditionally eligible under the programme’s investment assessment, indicating that they require further development before qualifying as priority projects.

Their inclusion in the COP31 presentation reflects Namibia’s efforts to attract investment into industries that could add value to mineral resources, establish domestic manufacturing capacity and reduce dependence on imported industrial products.

However, the proposed investments have not reached final investment decisions, and their inclusion in the pipeline does not mean that financing has been secured.

Green Metals Refining’s proposed development would establish a refinery producing high-purity manganese sulphate monohydrate, a processed manganese product used in battery manufacturing.

The first phase is valued at US$109 million and includes an associated sulphuric acid plant designed to produce 175,000 tonnes annually.

The proposed facility would expand Namibia’s mineral processing activities into higher-value industrial products, supporting the country’s ambition to develop downstream industries associated with critical minerals.

The project is planned for Farm 58, east of Walvis Bay, where Green Metals Refining received environmental clearance certificates for the manganese refinery and sulphuric acid plant on 9 October 2026.

Those approvals represent progress in the regulatory process but do not constitute a construction or final investment decision.

The programme’s project assessment identifies approximately US$200 million for the full development, with the US$109 million representing the first phase.

The acid plant is targeting an investment decision in the third quarter of 2027, while the manganese refinery is expected to reach that stage in the second quarter of 2028.

The proposed development would introduce additional industrial processing capacity in the Erongo Region, where mining, port infrastructure and energy developments are creating opportunities for new manufacturing activities.

However, the assessment does not confirm the refinery’s proposed annual manganese sulphate production capacity, the number of permanent jobs expected or the source of its manganese feedstock.

Green Brine Technologies is proposing a US$62 million industrial chemicals facility at Wlotzkasbaken in the Erongo Region.

The project would use concentrated brine associated with desalination operations to produce industrial chemicals, including caustic soda, chlorine and hydrochloric acid.

These products are used in mineral processing and other industrial activities, creating the possibility of supplying Namibian industries with chemicals manufactured domestically.

The proposal would also introduce a potential commercial use for desalination brine, which is ordinarily managed as a waste stream.

The project forms part of the programme’s efforts to identify industrial activities that can benefit from existing or proposed green energy and water infrastructure.

Green Brine Technologies is targeting a final investment decision in the second quarter of 2027.

However, the assessment does not establish the facility’s proposed production capacities, the volume of brine required or whether binding agreements have been concluded with desalination operators and prospective customers.

The development would depend on securing reliable feedstock supplies, electricity, financing and the necessary regulatory approvals.

Namib Industry Ceramics has proposed a US$41 million manufacturing facility in Tsumeb, Oshikoto Region, to produce ceramics and construction materials using renewable biomass.

The project is intended to establish local manufacturing capacity for products that could otherwise be imported.

Its inclusion in the green industrial pipeline reflects the programme’s intention to extend industrial development beyond hydrogen and ammonia production into sectors capable of supplying Namibia’s construction and manufacturing industries.

The proposed factory could create opportunities for domestic suppliers, transport companies and workers with manufacturing and technical skills.

The programme identifies the second quarter of 2027 as the targeted period for a final investment decision.

However, the presentation does not disclose the factory’s proposed annual production capacity, employment requirements or anticipated construction timetable.

The project remains subject to further development work and financing arrangements.

The three proposals form part of a broader green industrial investment pipeline presented at COP31.

According to the Namibia Green Hydrogen Programme, an initial market assessment identified 104 companies and projects, of which 78 were considered broadly aligned with the country’s industrial decarbonisation objectives.

Further screening examined project readiness, financing prospects, environmental requirements, employment potential and opportunities for domestic value addition.

The process produced an indicative pipeline of more than 18 opportunities, with 18 projects named in the November presentation.

These were divided into three categories according to their development readiness and potential contribution to Namibia’s green industrialisation ambitions.

Eight projects received priority classification, including Hyphen Hydrogen Energy, Zhero, Cleanergy, HyIron, Hy-ON, Kelp Blue, Nopal and Daures.

Other developments were placed in a monitoring category, while Green Metals Refining, Green Brine Technologies and Namib Industry Ceramics were classified as conditionally eligible.

The classification indicates that the three industrial projects have potential strategic value but still require further work to establish their readiness for investment.

The programme’s assessment identifies access to finance, infrastructure constraints, regulatory uncertainty and shortages of skilled workers among the obstacles facing green industrial developments.

It argues that concessional climate financing could help reduce the risks associated with emerging industries and projects using technologies that have not yet been widely deployed commercially.

The proposed approach includes attracting investment from development finance institutions, multilateral development banks and private investors.

However, the programme acknowledges that investment alone will not guarantee substantial economic benefits for Namibia.

The ability of local companies to participate in construction, supply equipment and services, and develop the skills required by new industries will influence how much of the investment remains in the domestic economy.

The assessment also identifies electricity supply, water availability and coordination between government institutions as important requirements for industrial development.

These issues are particularly relevant to mineral processing and manufacturing projects, which depend on reliable infrastructure and access to raw materials and markets.

The inclusion of manganese refining, industrial chemicals and ceramics manufacturing demonstrates an effort to broaden Namibia’s green industrial strategy beyond the production and export of hydrogen and ammonia.

The programme identifies mining and metals, construction materials and clean technology manufacturing as priority sectors alongside chemicals and green fuels.

It also highlights opportunities in copper, zinc, manganese, lithium and rare earth processing, as well as the manufacturing of solar, wind and electrolyser components.

These activities could support the government’s objective of increasing the contribution of manufacturing to the economy while creating additional demand for locally supplied goods and services.

Namibia’s sixth National Development Plan envisages manufacturing contributing 18% of gross domestic product by 2030, with employment in the sector reaching 80,000 jobs.

The three proposed developments could contribute to that ambition if they secure financing, obtain the necessary approvals and proceed to construction.

 

 

 

 

Share198Tweet124
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

November 18, 2026
Namibia showcases US$212m industrial projects at COP31

Namibia showcases US$212m industrial projects at COP31

November 18, 2026
Khama warns Botswana could wait years for De Beers dividends

Khama warns Botswana could wait years for De Beers dividends

November 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe