Langer Heinrich Mine restart up total cost now N$2.4b, up from N$2.2b
The total start-up project cost for Langer Heinrich Mine is now about N$2,4 billion (US$125 million), up from the previously...
The total start-up project cost for Langer Heinrich Mine is now about N$2,4 billion (US$125 million), up from the previously...
By Thomas Aipanda Mining is still a cornerstone of the Namibian economy, contributing significantly towards GDP. However, the success and...
Namibia's rough diamond production increased 9% to 2.3 million carats in 2023 from 2.1 million carats in 2022. In its...
Namibia has approved the transfer of the PEL 93 in blocks 1717 and 1817 of the Owambo onshore basin from...
The Otjikoto Mine produced an annual record of 208,598 ounces of gold, at the upper end of the guidance range...
Namibia is looking for local content visible in industrialisation, capacity building, and skills and technology transfer within the country's capabilities....
The Orange Basin oil and gas discoveries have propelled Sintana Energy to the pole TSX Venture position out of 50...
Blue Water Shipping company has opened an office at Walvis Bay due to the increased activities in the solar, wind,...
A private British Columbia company, Snow Lake Resources, has agreed to acquire 68% of Namibia Minerals and Investment Holdings, which...
A private British Columbia company, Snow Lake Resources, has agreed to acquire 68% of Namibia Minerals and Investment Holdings, which...
Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs
Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs