• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Langer Heinrich uranium revenue jumps 71% to US$304m

by Editor
August 26, 2026
in Uranium
0
Langer Heinrich uranium revenue jumps 71% to US$304m
510
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Paladin Energy’s Langer Heinrich Mine in Namibia generated US$304.3 million in uranium sales revenue during the 2026 financial year, a 71% increase from US$177.7 million the previous year, as higher production allowed the mine to sell significantly more uranium at improved prices.

The mine sold 4.35 million pounds of uranium oxide during the year ended 30 June 2026, up 61% from 2.71 million pounds in FY2025, while its average realised price increased 7% from US$65.70 to US$70 per pound.

The figures show the financial impact of Langer Heinrich completing its ramp-up after Paladin restarted the Namibian uranium operation in 2024.

Production increased 60% to 4.82 million pounds of uranium oxide from 3.02 million pounds in the previous financial year, reaching the upper end of Paladin’s guidance range. Sales of 4.35 million pounds also exceeded the upper end of guidance.

The difference between the 4.82 million pounds produced and 4.35 million pounds sold contributed to an increase in finished uranium inventory. Paladin ended June with 1.69 million pounds of finished product on site, in transit or at the converter, compared with 1.19 million pounds a year earlier.

Higher sales volumes and uranium prices helped turn the operation’s economics around during its first full financial year following the ramp-up.

Langer Heinrich recorded a gross profit of US$52.2 million, reversing a US$26.1 million gross loss in FY2025. Cost of production increased 62% from US$129.1 million to US$208.9 million as the operation transitioned to full mining, while cost of sales rose 30% to US$250 million.

The mine’s production cost increased from US$40.20 to US$43.30 per pound, meaning its US$70 average realised selling price was US$26.70 per pound above its reported production cost.

However, Paladin notes that its production-cost measure excludes several expenses included elsewhere in its financial accounts.  

Revenue increased, supported by a substantial expansion in mining and processing activity at Langer Heinrich. Ore mined increased 174% to 6.09 million tonnes, while tonnes processed rose 31% to 4.76 million tonnes.

Plant recovery improved from 84% to 90%, while the average feed grade increased 14% from 435 parts per million to 498 ppm.

Paladin is targeting another increase in sales during the current financial year, forecasting Langer Heinrich uranium sales of between 4.8 million and 5.3 million pounds in FY2027 against expected production of between 5.1 million and 5.6 million pounds.

Production costs are forecast at between US$44 and US$48 per pound.

The company’s price sensitivity analysis shows the value of those sales will depend heavily on uranium market conditions and its contract book. At an assumed uranium spot price of US$80 per pound, Paladin forecasts an average realised price of about US$72 per pound, rising to US$83 if the spot price reaches US$100 and US$93 at a US$120 spot price.

Langer Heinrich remains Paladin’s uranium-producing operation and overwhelmingly employs Namibians, with 99% of the mine’s employees reported as Namibian nationals as of 30 June 2026.

Share204Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In