• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, April 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Deep Yellow spends N$50 million on uranium exploration in Namibia as Tumas derisking advances in December quarter

by Editor
January 22, 2026
in Uranium
0
Deep Yellow’s new CEO Greg Field, takes charge at a critical moment for uranium growth
513
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Deep Yellow Limited says it spent A$4.12 million (approximately N$50 million) on exploration and evaluation activities during the December 2025 quarter, with the expenditure directed toward advancing its Namibian uranium portfolio, as the company continued to derisk the Tumas Project ahead of a future development decision.

According to the company’s December 2025 Quarterly Activities Report, work in Namibia during the period focused on both project-scale development at Tumas and near-mine exploration aimed at strengthening the long-term production profile.

A reverse circulation drilling programme was completed at the Tinkas Prospect, immediately adjacent to the Tumas Project, where uranium mineralisation of up to 11 metres thickness from surface was identified.

The results confirmed the presence of favourable palaeochannel-hosted mineralisation and provided further confidence in the broader mineralised system beyond the defined resource areas.

Additional broad-spacing drilling was carried out west of the main Tumas palaeochannel, with 39 holes drilled for a total of 1,801 metres.

The programme successfully confirmed the continuation of palaeochannel architecture and favourable sedimentary fill, supporting the geological model underpinning the Tumas deposits.

The work forms part of Deep Yellow’s strategy to incrementally expand the resource footprint while maintaining a disciplined approach to capital deployment.

Beyond exploration drilling, the company continued to progress technical workstreams tied directly to development readiness at Tumas.

Detailed engineering advanced further during the quarter, bulk earthworks continued, and key infrastructure and power arrangements moved closer to execution.

Deep Yellow said these activities are central to reducing execution risk and improving cost certainty as the project advances toward a potential final investment decision when market conditions permit.

From a cashflow perspective, Deep Yellow’s Appendix 5B Quarterly Cashflow Report for the quarter ended 31 December 2025 confirms that the A$4.12 million (≈N$50 million) exploration and evaluation spend was recorded under investing activities, reflecting fieldwork, drilling and geological assessment undertaken in Namibia.

Total net cash used in operating activities for the quarter amounted to A$15.79 million (about N$190 million), while development-related cash outflows reached A$14.02 million (about N$170 million), consistent with the company’s active derisking phase.

Deep Yellow ended the quarter with A$187.15 million in cash and cash equivalents (approximately N$2.25 billion), providing a substantial funding buffer to continue exploration, engineering and early works across its Namibian portfolio through 2026.

The company said this level of liquidity supports its ability to advance Tumas in a measured manner while maintaining flexibility around project timing.

The December quarterly results reinforce Deep Yellow’s focus on Namibia as a core jurisdiction, with exploration and technical programmes at Tumas aimed at underpinning a long-life uranium operation aligned with growing global demand for nuclear fuel.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Public review opens for Koppies West uranium project application

Elevate grows Namibian uranium footprint to 116 million pounds

April 28, 2026
Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

Galp confirms three-well drilling and testing campaign for Mopane

April 28, 2026
Deep Yellow says Tumas engineering now more than 60% complete

Deep Yellow says Tumas engineering now more than 60% complete

April 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In