• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, August 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada lifts tin output 14% as Uis throughput and shipments rise

by Editor
December 17, 2025
in News
0
Andrada’s revenue surged to N$274.5m in quarter ended 31 August from N$243m year earlier
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining increased tin concentrate production by 14% year on year to 429 tonnes during the quarter ended 30 November 2025, while contained tin output rose 10% to 255 tonnes, underpinned by higher plant throughput and stable recoveries at its Uis Mine in Namibia.

Ore processed during the quarter totalled 259,396 tonnes, an 8% increase compared with the same period last year. Average processing plant throughput improved to 146 tonnes per hour, up 12% year on year, while tin recovery remained steady at 73%, exceeding the company’s internal target for a third consecutive quarter.

Tin shipments increased to 15 for the quarter, 25% higher than the previous quarter, reflecting Andrada’s push to capitalise on stronger tin prices, which have risen by about 40% year to date in 2025 and moved above US$40,000 per tonne in December.

The improved performance was achieved despite planned maintenance and downtime associated with the company’s continuous improvement programme. Andrada said these interruptions were necessary to support long-term plant reliability and throughput stability.

Progress was also reported on the commissioning of the new jig processing plant at Uis. Ramp-up is under way, with early operational challenges related to fines build-up and shaking table configuration being addressed in collaboration with equipment suppliers.

Until third-party ore becomes available, the jig plant is processing material from Uis to maintain operational continuity and optimise performance.

Andrada reiterated its intention to source high-grade third-party ore, including from the nearby Goantagab area. Discussions around implementing an existing supply agreement are continuing, and the company said external ore sources remain a key part of its strategy to supplement production and support regional development.

Beyond tin, the company continued to advance its lithium strategy.

Metallurgical testwork on petalite at Uis is ongoing as part of broader lithium production studies, with results expected in the second half of 2026.

At the Lithium Ridge project, drilling activity accelerated during the quarter through the lithium joint venture with SQM, with a third drill rig deployed to speed up exploration. Initial assay results are expected in the first half of 2026.

Exploration work also continued at Brandberg West, where Andrada is targeting copper and tungsten mineralisation. Previous drilling has returned copper grades of up to 2% and tungsten mineralisation of a similar magnitude, supporting the company’s strategy to diversify its production base beyond tin.

Chief executive Anthony Viljoen said the quarter reflected continued operational progress at Uis, with improved throughput, consistent recoveries and higher production supported by favourable market conditions.

He said the existing operation provides a foundation for future growth through commissioning, optimisation and exploration across Andrada’s wider Namibian portfolio.

Looking ahead, Andrada said its focus will be on completing jig plant commissioning, further improving plant performance at Uis, advancing ore-sorting and lithium studies, and continuing exploration across its critical minerals portfolio.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Rosh Pinah commissions new ventilation fans as RP2.0 expansion advances

Rosh Pinah commissions new ventilation fans as RP2.0 expansion advances

August 24, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Tower waits on minister’s signature to unlock PEL 96 farm-out payment

August 24, 2026
OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

August 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In