• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, August 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Arcadia Minerals aim to raise N$28,5m for Bitterwasser Lithium Brine Project

by Editor
November 1, 2023
in Lithium
0
Arcadia Minerals aim to raise N$28,5m for Bitterwasser Lithium Brine Project
584
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Investors want to raise US$ 1.5m (N$28,5m) for Arcadia Minerals via the issue of 15 million Chess Deposit Interests shares at US$0.10c per placement.

Chess Depositary Interests are instruments traded on the Australian Stock Exchange that allow non-Australian companies to list their shares on the exchange and use the exchange’s settlement systems.

Arcadia Minerals Limited is developing several projects in Namibia, targeting lithium, tantalum, nickel, copper and gold in Hardap and Erongo regions.

The funds are for further exploration work at the Bitterwasser Lithium Brine Project, further metallurgical work and a pre-economic assessment of the Bitterwasser Lithium Clay Project.

The money will also be used for the map and sample program over the 200 known pegmatites on the Swanson project, working capital and costs of the offer.

Arcadia Minerals’ major shareholder, Raubex Group Limited, participated in the placement, subject to shareholder approval received on 20 September 2023, and funds of ~US$ 430,000 (N$8,17m) were received post-quarte 30 September 2023 (end of the quarter).

During the same period, Arcadia completed a 100% acquisition of the Lithium Clay Project through a payment of A$164,000 (N$1,9m).

Arcadia Minerals’ subsidiary, Brines Mining and Exploration Namibia, now owns the Bitterwasser Lithium-in-Clay Project after increasing its interest in the Bitterwasser Lithium Exploration company to 100% from the previous 25%.

Arcadia’s portfolio in Namibia includes the Swanson Mining Project, an advanced tantalum mining project currently under construction and expected to be in production by Q1/2025.

There is also the Bitterwasser Brines Project, prospective for lithium-in-brines, which will shortly be explored through sonic drilling to make a discovery.

Arcadia also has the Bitterwasser Clays Project, prospective for lithium-in-clays, which contains a mineral resource over which a pre-economic assessment is expected to be conducted to determine high-level economics.

There is the Kum-Kum Nickel Project – prospective for Nickel, Copper, and Platinum group elements and the TVC Lithium and Tantalum Project – prospective for hard rock Lithium and Tantalum.

The last one is the Karibib Project – prospective for copper and gold, which is expected to be explored further through a scout drilling and trenching program.

Share234Tweet146
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
ReconAfrica targets October for 1,000m horizontal test at Kavango West

ReconAfrica targets October for 1,000m horizontal test at Kavango West

August 25, 2026
Rosh Pinah commissions new ventilation fans as RP2.0 expansion advances

Rosh Pinah commissions new ventilation fans as RP2.0 expansion advances

August 24, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Tower waits on minister’s signature to unlock PEL 96 farm-out payment

August 24, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In