• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, May 16, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Koryx Copper to raise N$26.6m from selling 16 million shares

    Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

    Omitiomire – Namibia’s next copper mine

    Appian Capital Advisory acquires 95% stake in Omitiomire Copper Project

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich increases production to 1.29 million pounds in last quarter

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica targets May start for Kavango West 1X production testing

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    Paladin’s Namibian momentum draws UBS endorsement

    Langer Heinrich swings to US$18m profit as uranium sales top US$209m

    Meren Energy says TotalEnergies has submitted Venus field development plan

    Meren Energy says TotalEnergies has submitted Venus field development plan

    Oregen hires Venus architect as it targets Namibia’s Orange Basin

    Oregen hires Venus architect as it targets Namibia’s Orange Basin

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy trims US$15m funding burden, locks in 20% in PEL 93

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Ongombo copper targets 40ktpm output on 6.7Mt resource over 12–14 years

by Editor
April 10, 2026
in Copper
0
African Pioneer gets licence for Ongombo Copper-Gold Project
524
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The Ongombo Copper Project, located in Namibia’s Matchless copper belt, is being developed as a low-grade, low-tonnage operation targeting a production rate of 40,000 tonnes per month, with mine planning anchored in strict cost control and a projected life of 12 to 14 years.

The project lies approximately 45 kilometres from Windhoek and 1.5 kilometres northeast of the historic Otjihase Mine, within the Kuiseb Formation of the Southern Zone of the Damara Orogen.

The licence area spans 15.7 kilometres north–south and 12.5 kilometres east–west, covering a total of 12,092 hectares, with access via the B6 road toward Gobabis and the M53 gravel route.

Geologically, the deposit is hosted within the Matchless Member, a well-defined assemblage of foliated amphibolite, chlorite-amphibolite schist, talc schist and metagabbro.

This mineralised belt extends over 350 kilometres from the Gorob–Hope area toward Steinhausen and reaches widths of up to five kilometres in the Otjihase area.

Mineralisation across the belt is characterised by sulphide-rich “shoots” that range from a few tens of metres to as much as 400 metres wide and extend for several kilometres along strike.

At least 13 deposits have been identified within this system, clustered into three main zones: Gorob/Hope in the south, Matchless in the central belt, and Otjihase/Ongombo/Ongeama in the north.

At Ongombo, the resource is defined within these shoots, with both central and eastern zones contributing to the overall mineral inventory.

At a 0.6% copper cut-off, measured and indicated resources total 6.71 million tonnes grading 1.52% copper, 8 g/t silver and 0.32 g/t gold, with an average density of approximately 3.11 t/m³ and sulphur content of 8.5%.

Within this, the central shoot contributes 1.17 million tonnes at 1.83% copper (measured) and 0.57 million tonnes at 1.92% copper (indicated), while the eastern zone contributes 4.97 million tonnes at 1.4% copper.

Inferred resources at the same cut-off add a further 3.75 million tonnes grading 1.70% copper, 9 g/t silver and 0.32 g/t gold, with density around 3.06 t/m³ and sulphur content of 11.1%.

The central shoot accounts for 0.93 million tonnes at 1.43% copper, while the eastern zone contributes 2.82 million tonnes at 1.79% copper.

At a higher 1.0% copper cut-off, measured and indicated resources stand at 5.48 million tonnes grading 1.67% copper, 9 g/t silver and 0.32 g/t gold, with a density of approximately 3.12 t/m³ and sulphur content of 9.1%.

Inferred resources at this cut-off total 3.02 million tonnes grading 1.92% copper and 10 g/t silver, with sulphur content increasing to 11.9%.

Copper and silver are reported in measured and indicated categories, while gold remains classified as inferred.

The scale of the deposit informs the development strategy. With relatively modest tonnage compared to larger Southern African copper operations, the project is being designed as a low-cost mine with minimal infrastructure, in line with its shorter life and compact resource base.

The 40ktpm production target translates to approximately 480,000 tonnes per annum, reinforcing its positioning as a small but focused operation.

Despite its size, the deposit remains open along strike, providing some potential for incremental resource growth, although the overall production horizon remains constrained relative to larger regional assets.

Employment during construction is expected to range from 20 to 80 workers, while operational staffing will stabilise at 50 to 80 employees.

The mining operation will run two underground crews, each comprising 14 personnel: a miner, team leader, two blasting assistants, a drill rig operator and assistant, a roof bolter operator and assistant, a load-haul-dump operator, two truck drivers, and three face preparation assistants.

The Ongombo project forms part of Namibia’s broader effort to revitalise copper production within historically productive belts.

Its proximity to existing mining infrastructure at Otjihase and established access routes enhances its development profile, even as its economics remain tightly linked to disciplined cost management.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kendrick returns 112m at 3.03% TREO at Teufelskuppe rare earth project

Kendrick returns 112m at 3.03% TREO at Teufelskuppe rare earth project

May 16, 2026
Namibia’s chrome potential

Aldoro hits 504m rare earths intercept at Kameelburg

May 15, 2026
Koryx Copper to raise N$26.6m from selling 16 million shares

Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

May 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In