• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, October 12, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko’s first Chalkos drilling returns individual sample grading 6.42% copper

    Why Elizabeth Bay keeps coming back from the dead

    Why Elizabeth Bay keeps coming back from the dead

    Australian company Gibb River Diamonds acquires greenfield uranium projects in Erongo and Kunene

    Permit uncertainty pushes Gibb out of Namibia uranium exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

    Forsys’ Norasa in the making

    Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

    Elizabeth Bay Mine in trouble again

    US$50m investment targets restart of Elizabeth Bay diamond mine

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Eureka gets N$12.9m development funding push

    ReeXploration plans Phase 2 drilling after a 16.7 m uranium hit at Eureka

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Ongombo copper targets 40ktpm output on 6.7Mt resource over 12–14 years

by Editor
April 10, 2026
in Copper
0
African Pioneer gets licence for Ongombo Copper-Gold Project
603
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

The Ongombo Copper Project, located in Namibia’s Matchless copper belt, is being developed as a low-grade, low-tonnage operation targeting a production rate of 40,000 tonnes per month, with mine planning anchored in strict cost control and a projected life of 12 to 14 years.

The project lies approximately 45 kilometres from Windhoek and 1.5 kilometres northeast of the historic Otjihase Mine, within the Kuiseb Formation of the Southern Zone of the Damara Orogen.

The licence area spans 15.7 kilometres north–south and 12.5 kilometres east–west, covering a total of 12,092 hectares, with access via the B6 road toward Gobabis and the M53 gravel route.

Geologically, the deposit is hosted within the Matchless Member, a well-defined assemblage of foliated amphibolite, chlorite-amphibolite schist, talc schist and metagabbro.

This mineralised belt extends over 350 kilometres from the Gorob–Hope area toward Steinhausen and reaches widths of up to five kilometres in the Otjihase area.

Mineralisation across the belt is characterised by sulphide-rich “shoots” that range from a few tens of metres to as much as 400 metres wide and extend for several kilometres along strike.

At least 13 deposits have been identified within this system, clustered into three main zones: Gorob/Hope in the south, Matchless in the central belt, and Otjihase/Ongombo/Ongeama in the north.

At Ongombo, the resource is defined within these shoots, with both central and eastern zones contributing to the overall mineral inventory.

At a 0.6% copper cut-off, measured and indicated resources total 6.71 million tonnes grading 1.52% copper, 8 g/t silver and 0.32 g/t gold, with an average density of approximately 3.11 t/m³ and sulphur content of 8.5%.

Within this, the central shoot contributes 1.17 million tonnes at 1.83% copper (measured) and 0.57 million tonnes at 1.92% copper (indicated), while the eastern zone contributes 4.97 million tonnes at 1.4% copper.

Inferred resources at the same cut-off add a further 3.75 million tonnes grading 1.70% copper, 9 g/t silver and 0.32 g/t gold, with density around 3.06 t/m³ and sulphur content of 11.1%.

The central shoot accounts for 0.93 million tonnes at 1.43% copper, while the eastern zone contributes 2.82 million tonnes at 1.79% copper.

At a higher 1.0% copper cut-off, measured and indicated resources stand at 5.48 million tonnes grading 1.67% copper, 9 g/t silver and 0.32 g/t gold, with a density of approximately 3.12 t/m³ and sulphur content of 9.1%.

Inferred resources at this cut-off total 3.02 million tonnes grading 1.92% copper and 10 g/t silver, with sulphur content increasing to 11.9%.

Copper and silver are reported in measured and indicated categories, while gold remains classified as inferred.

The scale of the deposit informs the development strategy. With relatively modest tonnage compared to larger Southern African copper operations, the project is being designed as a low-cost mine with minimal infrastructure, in line with its shorter life and compact resource base.

The 40ktpm production target translates to approximately 480,000 tonnes per annum, reinforcing its positioning as a small but focused operation.

Despite its size, the deposit remains open along strike, providing some potential for incremental resource growth, although the overall production horizon remains constrained relative to larger regional assets.

Employment during construction is expected to range from 20 to 80 workers, while operational staffing will stabilise at 50 to 80 employees.

The mining operation will run two underground crews, each comprising 14 personnel: a miner, team leader, two blasting assistants, a drill rig operator and assistant, a roof bolter operator and assistant, a load-haul-dump operator, two truck drivers, and three face preparation assistants.

The Ongombo project forms part of Namibia’s broader effort to revitalise copper production within historically productive belts.

Its proximity to existing mining infrastructure at Otjihase and established access routes enhances its development profile, even as its economics remain tightly linked to disciplined cost management.

Share241Tweet151
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

Kaoko’s first Chalkos drilling returns individual sample grading 6.42% copper

October 12, 2026
Midas Otavi Copper Project acquisition cleared

Midas extends Spaatzu to 1.5km with grades of up to 2.39%

October 12, 2026
Arcadia finds funding partners for Swanson Tantalum Mine

Arcadia turns to European financiers as Swanson-Xinhai deal remains unresolved

October 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In