• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Askari targets 2026 for drilling at Uis polymetallic project

by Editor
December 8, 2025
in Magazine
0
Askari turns to inhouse super technology to identify new targets at Uis lithium project
517
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Askari Metals expects to mobilise drill rigs at Uis during 2026, with Executive Director Gino D’Anna stating that the company is now entering an active work phase enabled by its latest capital raise.

“We are setting up for a very busy 2026, and this funding will allow the company to continue its strong momentum and further the advancement of our exploration and development strategy.

“We look forward to mobilising drill rigs for our maiden drilling campaign and undertaking systematic exploration to unlock the value potential and upside of this exciting project.

“We will also be recommencing exploration activities at the Uis Project in Namibia, which presents a significant polymetallic opportunity showcasing high-grade tin, tantalum, rubidium and lithium mineralisation.

“We have completed significant exploration in the past and look forward to releasing the assay results from our recent trenching campaign at a time when tin prices remain at record highs,” he said.

The funding behind the anticipated 2026 mobilisation reflects a capital raise of A$1.15 million, approximately N$13.3 million, through commitments from sophisticated investors and participating directors whose total contribution amounted to A$150,000.

Following the raise, Askari holds about A$3.2 million, or around N$37 million, in cash and assets held for sale, enabling operations across both Namibia and Ethiopia.

Although part of the capital has been allocated to the maiden drilling programme at Nejo, Askari confirmed that exploration at Uis will recommence upon release of pending trenching assay results, which will guide target ranking and drill design.

Askari first entered Namibia in December 2021 by acquiring 90 per cent of EPL 7345 and EPL 8535 from Earth Dimensions Consulting CC.

The company increased its ownership to 100 per cent in April 2023 and later expanded its Uis footprint with EPL 7626.

Lithium was not recorded during historical tin mining activities in the area, and no individual or company is documented as the original discoverer of the lithium system.

Instead, spodumene-bearing lithium was first publicly confirmed during Askari’s own due diligence sampling after acquisition.

The mineralisation is hosted in LCT pegmatites — lithium, caesium, tantalum — making Uis a hard-rock spodumene project rather than a brine or clay system.

Spodumene is the globally dominant mineral used for lithium concentrate production, and processing typically feeds into lithium hydroxide or carbonate supply chains.

Before drilling began, the company conducted mapping and surface sampling across the mapped pegmatites.

In 2022, spodumene-hosted lithium grading up to roughly 3.1 per cent Li₂O was identified at the surface, which had not previously been drill-tested.

This led to Phase I RC drilling at EPL 7345: 59 holes totalling around 3,017 metres were completed in December 2022.

Assays returned in 2023 confirmed lithium-bearing pegmatites, although no JORC resource has been declared.

A second RC programme began on 26 February 2023 at EPL 8535, also comprising 59 holes for approximately 3,523 metres and generating 1,632 samples.

Results recorded intervals such as 1 metre at around 0.26 per cent SnO₂, supported by tantalum.

Reinterpretation of old and new data returned tin oxide grades above 3 per cent, tantalum pentoxide above 5,000 ppm, and rubidium oxide between 0.8 and 0.9 per cent, confirming that Uis is polymetallic beyond lithium alone.

By late 2023, Askari defined a fifteen-kilometre by five-kilometre corridor of interest across EPL 7345 and EPL 8535.

A regional sediment and soil sampling programme was prepared in parallel with trenching to refine drill targeting.

The final trench assay results have not yet been released, and they are expected to define the exact drill collars once received.

With licence ownership now consolidated, corridor geometry mapped, surface mineralisation confirmed, and funding secured, Askari’s next step is to complete assay release, rank drill targets, and proceed to drilling.

The company has stated that 2026 is the planned operational window for rig mobilisation at Uis, subject to field-ready data and logistical clearance.

Share207Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
14-year-old Namibian boy eyes nuclear career after Arctic expedition

14-year-old Namibian boy eyes nuclear career after Arctic expedition

September 26, 2026
BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

September 25, 2026
BoN Symposium: Namibia warned against oil contracts that limit future law changes

BoN Symposium: Namibia warned against oil contracts that limit future law changes

September 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In