• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, August 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Namibia has never conducted groundwater radionuclide survey – hydrogeologist

by Editor
November 21, 2025
in Magazine
0
Namibia has never conducted groundwater radionuclide survey – hydrogeologist
509
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

A visiting European hydrogeologist has warned that Namibia is operating “blindfolded” when it comes to radiation risks in its groundwater, saying the country has never conducted a centralised survey to measure radionuclides in its aquifers.

Speaking at a public talk in Windhoek on 30 August 2022, Czech mining engineer and hydrogeologist Jan Fajgl said the absence of baseline data leaves both regulators and communities vulnerable.

His lecture, titled Uranium Exploration: Ecology, Radiation and Safety, focused heavily on the Stampriet Artesian Basin, a critical groundwater source for southern Namibia.

To explain the risk, Fajgl began by clarifying what radionuclides are. He described them as naturally radioactive atoms found in rocks, soil and groundwater, particularly in areas with uranium.

As these atoms decay over time, they release radiation. Common examples include uranium, radon and radium.

Fajgl noted that although these radioactive particles are microscopic, their effects accumulate over time.

When their concentrations in drinking water exceed safe levels, they can affect people, livestock, and crops.

Fajgl stressed that, despite the presence of uranium-bearing geology in parts of Namibia, the country has never conducted a dedicated groundwater radionuclide survey.

He pointed out that over a century of research has been conducted on the basin, starting with hydrogeological assessments in 1915, the extensive Water Quality Map Project between 1968 and 1981, and a Japanese-funded evaluation in 2002.

None of these studies measured radionuclides. He said that essential parameters such as arsenic, cyanide and radioactivity are still not measured in areas where they may naturally occur. The only known radionuclide tests in the basin were commissioned privately by Headspring Investments for a uranium project, with samples sent abroad for laboratory analysis.

There is no record of a NamWater-led or government-backed study.

Drawing on guidance from the World Health Organisation, Fajgl explained that naturally occurring radionuclides in groundwater often deliver higher radiation doses than those from artificial sources.

Near uranium ore bodies, groundwater may contain radon, uranium, radium and radioactive lead, sometimes at levels above drinking-water standards. Without baseline measurements, Namibia has no way of knowing which boreholes are safe, how radionuclide concentrations change over time or how exploration and drilling might affect the aquifer.

Fajgl also noted that Namibia’s groundwater is already under stress. Previous NamWater evaluations found pollution in boreholes supplying at least 16 towns, as well as in 17 water schemes serving police stations, schools and other institutions. These assessments highlighted issues such as high levels of sodium, nitrate, fluoride, and other chemicals, often from human activity. However, radionuclides, which could also be present, were not tested at all. According to Fajgl, “When you do not test for radiation, you will not find it,” and he warned that this absence of testing does not guarantee safety.

He contrasted Namibia’s gap with international practice. In the United States, strict testing under the Safe Drinking Water Act is supported by a nationwide network of certified laboratories that analyse radionuclides. Namibia has no such infrastructure. Fajgl emphasised that the country lacks a certified national laboratory, a mapped radiation-risk profile of its aquifers, routine borehole monitoring or regulations aligned with WHO radiation limits. WHO recommends 0.5 Bq/L for gross alpha and 1 Bq/L for gross beta radiation in drinking water, but Namibia has never surveyed to determine its groundwater status relative to these benchmarks.

Fajgl argued that Namibia urgently needs to establish clear radiation standards, establish a certified national laboratory, conduct a large-scale survey of underground water for radionuclides, and identify safe boreholes and high-risk zones. He said continuous, long-term monitoring and strict intake protocols should follow. These measures, he added, are basic safeguards in countries with uranium industries.

He closed with a warning that contamination cannot be reversed without knowing the aquifer’s original conditions. After mining ends, groundwater must be restored to its natural state; without baseline measurements, it will be scientifically impossible to determine the aquifer’s original radionuclide levels.

“Without knowing the original radionuclide levels,” he said, “you cannot detect contamination, you cannot monitor it, and you cannot restore the aquifer to what it was. You cannot restore what you never measured.”

Share204Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

August 20, 2026
Amutse says Namibia must be ready onshore before first oil flows offshore

Amutse says Namibia must be ready onshore before first oil flows offshore

August 19, 2026
Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

August 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In