• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, June 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Arkle set to drill after confirming uranium across Erongo targets

    Arkle set to drill after confirming uranium across Erongo targets

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Critical Metals

Askari Metals targets tin and tantalum in Uis Phase 1 exploration

by Editor
May 26, 2026
in Critical Metals
0
Askari Metals targets tin and tantalum in Uis Phase 1 exploration
510
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Askari Metals has commenced its Phase 1 field programme at EPL 7626 near the Uis Tin Mine in Namibia, with results from the campaign expected to determine a series of trenching and drilling programmes across its growing portfolio in the Uis district.

The Australian-listed explorer announced on 26 May that the programme is underway at its wholly owned licence in the Erongo Region, targeting polymetallic mineralisation including tin, tantalum, rubidium, caesium and lithium.

The work comprises geological mapping, rock-chip sampling and a licence-wide soil geochemical sampling campaign designed to identify buried lithium-caesium-tantalum (LCT) pegmatites beneath surface cover.

The company’s future work is being driven by the results of an in-house remote sensing study conducted over EPL 7626.

The study identified lithological zones with spectral signatures consistent with tin-tantalum pegmatite-hosting mica schists already mapped on neighbouring EPL 7345.

Askari believes these same geological units extend northeastwards from EPL 7345 through Andrada Mining’s Uis Tin Mine and into EPL 7626 beneath surface cover, highlighting the potential for concealed pegmatite mineralisation.

The study utilised Sentinel-2 multispectral satellite imagery combined with Principal Component Analysis (PCA) and decorrelation stretch techniques to enhance geological interpretation and identify prospective targets.

According to the company, the refined hyperspectral methodology has already generated a pipeline of pegmatite prospects, including MW, Eve, GP and K10 on EPL 7345, as well as Tawny, Martial and Zebedeus 1 on EPL 8535.

Executive director Gino D’Anna said the same exploration model had enabled the company to track the mineralised trend across the broader Uis district and onto EPL 7626.

“Utilising this same exploration model, the Company has been able to interpret the mineralised trend north eastwards from EPL 7345 through the Uis Tin Mine and onto EPL 7626,” D’Anna said.

To test that interpretation, Askari has established a 400-metre by 40-metre soil sampling grid across approximately 68 square kilometres of EPL 7626. The programme will collect 4,258 samples to detect geochemical halos associated with buried pegmatites.

A key component of the programme is the use of the company’s on-site pellet press and Laser-Induced Breakdown Spectroscopy (LIBS) equipment, which allows samples to be processed and analysed rapidly in the field. Askari believes the technology will significantly reduce assay turnaround times and accelerate target generation.

“With the Company’s pellet press and LIBS machines on site at Uis, the Company will be able to ensure a much quicker assay turnaround time,” D’Anna said.

The current programme, including the receipt and interpretation of results, is expected to be completed within approximately three months. The outcomes will determine the next phase of exploration.

Planned future work at the Uis Project includes a second phase of infill soil geochemical sampling on EPL 7626, a first-phase trenching programme on EPL 7626, a first-phase trenching programme on EPL 8535, a reverse-circulation drilling campaign on EPL 7345, and a second-phase trenching programme on EPL 7345.

“The next few months promises a steady flow of news from Uis,” D’Anna said.

The Uis Project is located adjacent to Andrada Mining’s operating Uis Tin Mine, which hosts a JORC-compliant mineral resource estimate of 77.51 million tonnes grading 0.79% lithium oxide, 0.15% tin and 82 parts per million tantalum, making it one of Namibia’s most significant hard-rock lithium and tin districts.

Share204Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

June 26, 2026
Aldoro secures funding and new drill rig for expanded Kameelburg program

Aldoro prepares for resource update after intersecting a record 542.9m at 1.38% TREO at Kameelburg

June 26, 2026
Arkle set to drill after confirming uranium across Erongo targets

Arkle set to drill after confirming uranium across Erongo targets

June 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In