• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, April 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Galp and partners find ‘significant column of light oil’ on Mopane-2X in the Orange Basin

    Sintana moves to list on NSX, opens offshore oil play to Namibians

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Otjikoto generates N$2.67b in Q3 as B2Gold approves N$1.96b Antelope underground expansion

by Editor
November 6, 2025
in Gold
0
Otjikoto produces annual record 208,598 ounces in 2023
513
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

B2Gold’s Otjikoto Mine in Namibia continued to outperform expectations during the third quarter of 2025, producing 44,105 ounces of gold and generating N$2.67 billion (US$143 million) in revenue — a sharp rise from N$2.49 billion in the same period last year.

The strong quarter reinforced Otjikoto’s position as one of the company’s most reliable African operations.

Mill throughput reached 873,000 tonnes at an average grade of 1.59 grams per tonne, with recovery rates of 98.6%.

The average realised gold price surged to US$3,503 per ounce (about N$65,000), helping offset higher operating costs.

Cash operating costs rose to US$781 (N$14,600) per ounce produced, while all-in sustaining costs (AISC) climbed to US$1,089 (N$20,400) per ounce sold due to one-off expenses linked to the wind-down of open-pit mining and higher royalties.

Capital expenditure totalled US$4.4 million (N$82 million), mainly for Wolfshag underground development and equipment rebuilds, while exploration spending reached US$2.2 million (N$41 million).

Despite cost pressures, Otjikoto remains on track to meet its 2025 production guidance of 185,000 to 205,000 ounces, supported by the Wolfshag underground mine and substantial ore stockpiles from the final Otjikoto pit pushbacks.

With open-pit mining nearing completion, B2Gold approved a N$1.96 billion (US$105 million) investment in the Antelope underground deposit, marking the next phase in the mine’s evolution.

The Antelope project, designed as a small-scale, low-cost underground operation, will supplement processing of stockpiles between 2028 and 2032 and is expected to lift Otjikoto’s production to roughly 110,000 ounces per year over that period.

The preliminary economic assessment (PEA) outlines a five-year mine life with total production of 327,000 ounces, averaging 65,000 ounces annually.

The deposit hosts 1.75 million tonnes grading 6.91 g/t gold for 390,000 ounces, mainly within the Springbok Zone, and remains open along strike, offering further growth potential.

For 2025, B2Gold forecasts cash operating costs of US$635–695 (N$11,900–13,000) per ounce produced and AISC of US$965–1,025 (N$18,000–19,200) per ounce sold.

B2Gold says its strategy remains focused on maximising responsible, profitable production, maintaining a strong balance sheet, and investing in future growth.

With the Antelope underground project now approved, Otjikoto is poised to remain Namibia’s flagship gold operation well into the 2030s.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
NJ Ayuk urges IOCs to invest in Namibia

NJ Ayuk urges IOCs to invest in Namibia

April 19, 2026
Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

April 17, 2026
Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

April 17, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In