• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, May 11, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

    Northern Graphite begins relocating plant for Okanjande restart late 2027

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Otjikoto generates N$2.67b in Q3 as B2Gold approves N$1.96b Antelope underground expansion

by Editor
November 6, 2025
in Gold
0
Otjikoto produces annual record 208,598 ounces in 2023
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

B2Gold’s Otjikoto Mine in Namibia continued to outperform expectations during the third quarter of 2025, producing 44,105 ounces of gold and generating N$2.67 billion (US$143 million) in revenue — a sharp rise from N$2.49 billion in the same period last year.

The strong quarter reinforced Otjikoto’s position as one of the company’s most reliable African operations.

Mill throughput reached 873,000 tonnes at an average grade of 1.59 grams per tonne, with recovery rates of 98.6%.

The average realised gold price surged to US$3,503 per ounce (about N$65,000), helping offset higher operating costs.

Cash operating costs rose to US$781 (N$14,600) per ounce produced, while all-in sustaining costs (AISC) climbed to US$1,089 (N$20,400) per ounce sold due to one-off expenses linked to the wind-down of open-pit mining and higher royalties.

Capital expenditure totalled US$4.4 million (N$82 million), mainly for Wolfshag underground development and equipment rebuilds, while exploration spending reached US$2.2 million (N$41 million).

Despite cost pressures, Otjikoto remains on track to meet its 2025 production guidance of 185,000 to 205,000 ounces, supported by the Wolfshag underground mine and substantial ore stockpiles from the final Otjikoto pit pushbacks.

With open-pit mining nearing completion, B2Gold approved a N$1.96 billion (US$105 million) investment in the Antelope underground deposit, marking the next phase in the mine’s evolution.

The Antelope project, designed as a small-scale, low-cost underground operation, will supplement processing of stockpiles between 2028 and 2032 and is expected to lift Otjikoto’s production to roughly 110,000 ounces per year over that period.

The preliminary economic assessment (PEA) outlines a five-year mine life with total production of 327,000 ounces, averaging 65,000 ounces annually.

The deposit hosts 1.75 million tonnes grading 6.91 g/t gold for 390,000 ounces, mainly within the Springbok Zone, and remains open along strike, offering further growth potential.

For 2025, B2Gold forecasts cash operating costs of US$635–695 (N$11,900–13,000) per ounce produced and AISC of US$965–1,025 (N$18,000–19,200) per ounce sold.

B2Gold says its strategy remains focused on maximising responsible, profitable production, maintaining a strong balance sheet, and investing in future growth.

With the Antelope underground project now approved, Otjikoto is poised to remain Namibia’s flagship gold operation well into the 2030s.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

Northern Graphite begins relocating plant for Okanjande restart late 2027

May 7, 2026
Otjikoto delivers N$13 billion revenue as 2025 gold output nears 200,000 ounces

Otjikoto’s Q1 2026 revenue rises to N$2.9 billion despite sharp drop in gold output

May 7, 2026
Kameelburg drilling confirms rare earth, strontium and niobium system

Aldoro hits 0.76% niobium over 11m, 2.94% REE at 74m at Kameelburg

May 7, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In