• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, August 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Cleanergy Solutions plans ammonia terminal at Walvis Bay

by Editor
September 3, 2025
in Magazine
0
Cleanergy Solutions plans ammonia terminal at Walvis Bay
593
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Cleanergy Solutions and its joint venture partner, CMB.TECH are planning to construct an ammonia terminal at the Walvis Bay port area in the Erongo Region as part of Namibia’s growing green hydrogen economy. The terminal is regarded as an essential component in the development of the country’s green ammonia industry, providing capacity for storage and export.

According to the Environmental Clearance Certificate application, the proposed ammonia terminal will consist of a 40,000 metric ton storage tank with associated export facilities, a nitrogen generation unit, an instrument air unit, fire and service water tanks with pumps, an emergency diesel generator, and a wastewater treatment unit.

The facility will be linked to the hydrogen production plant via a dedicated ammonia pipeline to transfer liquid ammonia for storage and later export through the jetty at Walvis Bay North Port.

During the first five years of operations, the proponent is also considering the option of importing ammonia.

Cleanergy Solutions Namibia (Pty) Ltd, the project’s applicant, is a joint venture between the Ohlthaver & List (O&L) Group and CMB, a company based in Belgium.TECH.

The partners are already constructing Namibia’s first hydrogen production and refuelling plant in Walvis Bay, with first production expected at the beginning of 2025.

The ammonia terminal will provide the following link in this chain, ensuring Namibia has the infrastructure to handle and export green ammonia at scale.

CMB.TECH, a Belgium-based company and part of Compagnie Maritime Belge, founded in 1895, specialises in the design, construction and operation of marine and industrial transport systems powered by hydrogen and ammonia.

Its collaboration with O&L has positioned Cleanergy Solutions Namibia at the forefront of efforts to drive Namibia’s hydrogen economy while contributing to global decarbonisation.

The site for the ammonia terminal is located within the North Port of Walvis Bay, accessible via the B2 road between Swakopmund and Walvis Bay, and is aligned with the overall port development master plan. Cleanergy Solutions Namibia and CMB.TECH Namibia have secured an option agreement from Namport to lease a portion of land in this area.

During the construction phase of the project, approximately 700 temporary positions for semi-skilled and unskilled labourers could be generated, benefiting the local and regional community.

It is expected that local labour will be employed for the basic construction of the double-wall full containment ammonia storage tank and associated facilities, as set out in the Draft Environmental and Social Impact Assessment of December 2024.

The impact is described as beneficial, direct and partly reversible due to the short duration of the construction period, which is less than five years.

The possibility of these jobs materialising is definite, as workers will be required for the project to proceed.

The magnitude of change is considered minor due to the temporary nature of the positions, but improvements to the livelihoods of members of the Erongo Region are anticipated.

The sensitivity of the impact is expected to be medium due to its regional scale, and the overall significance is classified as moderately beneficial.

In addition to direct employment, the Ammonia Terminal project is anticipated to create indirect employment opportunities throughout its construction, operation, and eventual decommissioning phases.

Collaborating with service providers and short-term contractors will generate opportunities for indirect jobs across the Erongo Region and potentially at a national level.

During construction, contractors, subcontractors, and general workers will be needed. During operations, compliance checks, quality inspections, and both planned and ad hoc maintenance will also create demand for services. Certain expertise and services will be outsourced, generating further employment and skills development that will benefit other organisations.

Local or national suppliers may be used for non-specialised equipment and machinery, while specialist supplies will likely need to be imported.

The project is positioned as a pilot in its initial phase, designed to test the market, establish skills and standards, and prepare Namibia for growth in hydrogen and ammonia exports.

By creating infrastructure for handling, storing and exporting ammonia, the terminal will complement the hydrogen production facilities already under construction and anchor the country’s entry into the global green ammonia industry.

Share237Tweet148
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

August 20, 2026
Amutse says Namibia must be ready onshore before first oil flows offshore

Amutse says Namibia must be ready onshore before first oil flows offshore

August 19, 2026
Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

August 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In