• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, September 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Oregen pushes WestOil stake to 48.5%

by Editor
August 28, 2025
in Oil & Gas
0
Rhino Resources signs up Northern Ocean’s Deepsea Mira for N$740m to spud Volans-1X this July
527
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Oregen Energy Corp. has increased its holdings in Namibia’s offshore Orange Basin by acquiring an additional 36 per cent equity interest in WestOil Limited. This private company owns 70 per cent of Block 2712A.

Oregen, formerly Supernova Metals Corp., completed the acquisition through its purchase of Oranam Energy Limited.

The deal increases Oregen’s stake in WestOil to 48.5 per cent and grants the company a 33.95 per cent net working interest in Block 2712A (PEL 107).

Under the share exchange agreement, Oregen issued 22 million shares and paid US$1 million (about N$18.5 million) in cash to Oranam shareholders.

Certain shareholders placed their stock under an 18-month escrow arrangement.

Alongside the acquisition, Oregen closed the first tranche of a brokered equity financing worth CAD $ 3.6 million (approximately N$48.6 million).

The LIFE Offering raised C$1.7 million (N$23.1 million) through the issuance of 4.77 million units, priced at C$0.36 each, which included one share and one warrant exercisable at C$0.54 until August 2027.

The Private Placement Offering raised a further C$1.9 million (N$25.6 million) through subsidiary FinanceCo, with the securities later exchanged one-for-one into Oregen shares and warrants.

Research Capital Corp. led the financing with Canaccord Genuity and Roth Canada Inc. as agents. T

he warrants are expected to trade on the Canadian Securities Exchange under the symbol ORNG.WT once they become exercisable later this year.

Oregen said it is positioning itself as an early mover among small-cap companies with direct exposure to Namibia’s deepwater frontier. The company plans to conduct a 3D seismic survey in the fourth quarter of 2025 and initiate a farm-out process in 2026 to attract major partners ahead of planned drilling in late 2026 or 2027. It is also in talks to secure additional offshore acreage in the Orange, Walvis and Lüderitz basins.

Concurrent with the acquisition and financing, the company changed its name to Oregen Energy Corp.

Its shares continue to trade under the ticker ORNG once Canadian Securities Exchange requirements are finalised.

Oregen describes itself as an Africa-focused investment company, with its flagship asset being the 33.95 per cent net working interest in Block 2712A, an area at the centre of Namibia’s rising global oil profile.

The block covers 5,484 km² in deepwater off Namibia and is located near some of the basin’s most significant discoveries, including TotalEnergies’ Venus, Shell’s Graff, Galp’s Mopane, and the Rhino/BP-ENI Capricornus finds. “The Orange Basin is fast emerging as one of the world’s most exciting new petroleum provinces, and Block 2712A is strategically located in the heart of the action,” the company said.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

September 21, 2026
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In