• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, September 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Askari Metals keeps reduced team at Uis project for low-cost but high impact

by Editor
May 3, 2025
in News
0
Askari Metals keeps reduced team at Uis project for low-cost but high impact
523
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Askari Metals is keeping a reduced team working at the Uis Project in Namibia, focusing on low-cost, high-impact exploration, which will deliver further high-confidence trenching targets and priority drilling targets.
The Uis Project comprises EPLs 7345, 8535and 7626 and adjoins the Uis Tin Mine, owned by Andrada Mining.
The company is also waiting for the laboratory assay results from Act Labs for the Phase 1 trenching and channel sampling program at EPL 7345 carried out during the March 2025 quarter.
The results will reinforce and confirm the Uis project’s polymetallic mineralisation and the company’s focus on expanding the extensive tin and tantalum mineralisation encountered in the historic exploration.
Askari Metals is still reviewing and interpreting the Uis project historic exploration database at the Uis Project, initially focused on EPL 8535.
The company is also interpreting the historic exploration database focused on expanding the tin and tantalum mineralisation identified at EPL 7345 and 7626.
A comprehensive technical review of the historical exploration data has enabled Askari Metals to re-interpret the geological information focused on delineating and demonstrating the extensive tin and tantalum mineralisation identified through previous exploration at EPL 8535.
The re-interpretation of the data supports the company’s view that the Uis Project offers a strategic polymetallic project opportunity, offering tin, tantalum, rubidium and lithium mineralisation.

Share209Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
14-year-old Namibian boy eyes nuclear career after Arctic expedition

14-year-old Namibian boy eyes nuclear career after Arctic expedition

September 26, 2026
BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

September 25, 2026
BoN Symposium: Namibia warned against oil contracts that limit future law changes

BoN Symposium: Namibia warned against oil contracts that limit future law changes

September 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In