• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, September 22, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx Copper plans 55,000-m drill program at Haib, targets end of 2025 for PFS

by Editor
February 21, 2025
in Copper
0
Koryx Copper plans 55,000-m drill program at Haib, targets end of 2025 for PFS
542
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper plans to drill 55,000 metres at its Haib project for 2025 to increase the size and grade of the mineral resource estimate.
The Haib project in south Namibia is an advanced-stage, long-life, low-cost, low-risk open-pit copper/molybdenum/gold project envisaged to produce a clean copper concentrate via a conventional crushing/milling/flotation metallurgical process.
The project has the potential for additional copper production via heap leaching.
Koryx Copper says the 2025 technical strategy also comprises multiple technical, environmental, and metallurgical studies.
This program will result in an updated preliminary economic assessment and pre-feasibility study to be published before the end of 2025.
The company says this fast-tracked technical strategy represents a significant step-change in the development of Haib geared towards the rapid development of the project to the bankability stage, with significant permitting and all technical studies to be concluded by the end of 2026.
Koryx Copper CEO Heye Daun says they are putting a big effort into increasing the geological horsepower and infrastructure on the ground to understand the Haib and to be able to expedite the 55,000-metre drill program.
“With the met testwork program going very well and ongoing excellent drill results, we believe that 2025 will be another transformative year for the Haib Copper Project in Namibia, as we rapidly advance the project towards economic and technical feasibility,”  Daun says.

Share217Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Nandi-Ndaitwah courts US investment in Namibia’s critical minerals

Nandi-Ndaitwah courts US investment in Namibia’s critical minerals

September 21, 2026
TotalEnergies wins 345m-litre Namibia fuel supply deal

TotalEnergies wins 345m-litre Namibia fuel supply deal

September 21, 2026
SciAps takes real-time mineral analysis deeper into African exploration

SciAps takes real-time mineral analysis deeper into African exploration

September 21, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In