• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

ReconAfrica completes drilling on Naingopo

by Editor
November 28, 2024
in Oil & Gas
0
2024 HOPEFULS: ReconAfrica to engage community, work on accessing land, drilling in late Q1
527
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Reconnaissance Energy Africa has reached a total depth of 4,184 metres (13,727 feet) on the Naingopo exploration well on Petroleum Exploration Licence 073 onshore Namibia.
The Naingopo well is targeting 181 million barrels of unrisked and 15 million barrels of risked prospective light/medium oil resources, or 937 billion cubic feet of unrisked and 65 billion cubic feet of risked prospective natural gas resources, on a 100% working interest basis, based on the most recent prospective resources report prepared by Netherland, Sewell & Associates, Inc. (“NSAI”).
The company will undertake a comprehensive logging and coring program, perform a VSP, and casing and cement the well.
The results of the well will be provided following a thorough analysis of the subsurface data acquired and any oil or natural gas samples that have been obtained.
ReconAfrica expects to have the preliminary results of the Naingopo well in the next several weeks.
Reconafrica will move to the Kumbundu (Prospect P) well location after reviewing the results from current operations.
Kambundu is targeting 309 million barrels of unrisked and 15 million barrels of risked prospective light/medium oil resources, or 1.6 trillion cubic feet of unrisked and 64 billion cubic feet of risked prospective natural gas resources, on a 100% working interest basis, based on the most recent prospective resources report prepared by NSAI.
During December 2024, the company will undertake repair and maintenance activities on the Jarvie-1 drilling rig.
ReconAfrica CEO Brian Reinsborough expressed excitement about completing the drilling operations on the Naingopo exploration well, drilling beyond the original projected TD of 3,800 metres.
Reinsborough said the Naingopo well is the first of several to test the potential resource of the Damara Fold Belt.
“We will now commence an extensive evaluation program, which will include wireline logging and coring, Modular Formation Dynamics Tester (“MDT”) sampling and testing of any hydrocarbons present, and a Vertical Seismic Profile (“VSP”).
“Our technical team will then assess all data to determine the results, which will assist us in finalizing further plans in the Damara Fold Belt,” Reinsborough said.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In