• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy finalises Namibian drilling tenders for uranium project

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Midas latest drill results confirm 800-metre copper-silver at Spaatzu discovery

    Midas deploys eight drilling rigs to define three Otavi copper resources

    Public review opens for Koppies West uranium project application

    Elevate cuts drilling to one rig as Marenica resource update nears

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Van Aswegen takes charge of Bannerman Mining Resources Namibia

    Van Aswegen takes charge of Bannerman Mining Resources Namibia

    Reviving the Moosehead in PEL 87

    Pancontinental’s Namibia oil drilling plans hinge on finding a partner

    Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

    Connected Minerals puts two Namibian uranium projects on hold

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gas

BW Energy to start drilling Kudu gas project early 2025

by Editor
May 28, 2024
in Gas
0
BW Energy to start drilling Kudu gas project early 2025
759
SHARES
2.2k
VIEWS
Share on FacebookShare on Twitter

BW Energy chief executive officer Carl Arnet says they could start drilling at the Kudu gas project in early 2025.

The Kudu gas discovery is in the northern Orange sub-basin, approximately 130 km off the southwest coast of Namibia. 

It is situated in Petroleum Production License 003, which has an area of 4,567 square kilometres. 

The field water depth is approximately 170 metres. 

Kudu-1 discovered the field in 1974, and seven subsequent wells delineated it.

BW Energy entered into a farm-in agreement for a 56% operated interest in early 2017, with Namcor holding a 44% joint venture interest. 

In 2021, BW Energy signed a Farm-up agreement with NAMCOR, increasing the company’s interest to 95% in the license, and closed the transaction.

The company, which released its 2024 first quarter results on May 24, said it is progressing the revised development plan for the gas-to-power project and analysing data from the 3D seismic survey completed in May 2023. 

According to the company, the revised development concept offers tangible financial, schedule, and environmental benefits. 

Additionally, BW Energy said reusing existing facilities substantially reduces field development-related greenhouse gas emissions compared to a newly built facility. 

“Interpretation of the initial data has enhanced the depositional model and de-risked potential targets with additional prospects identified, and the company continued the work on securing long-lead items for a future exploration program,” BW Energy said in the report.

Although BW Energy signed an agreement to purchase the semi-submersible drilling rig West Leo from Aquadrill LLC, which is targeted for use in Kudu in the first quarter of 2022, its CEO said they were talking with other operators about hiring a rig.

Speaking in the company’s first-quarter conference call after the results, Arnet said the company had secured long-lead items for a 2025 exploration campaign.

According to Arnet, increased drilling activity within the Orange Basin has improved rig availability.

“Our discussions with other operators in the Orange basin have been very productive.

“We may access drilling capacity sooner than expected. We aim to start as early as 2025,” Arnet said.

Share304Tweet190
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Botala moves closer to first commercial gas production in Botswana

Botala moves closer to first commercial gas production in Botswana

October 30, 2026
Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

Core Energy finalises Namibian drilling tenders for uranium project

October 30, 2026
Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

October 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe