• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Gratomic Inc says Aukam Graphite Project could produce within 4 months if funds are available

by Editor
April 3, 2024
in News
0
Gratomic Inc says Aukam Graphite Project could produce within 4 months if funds are available
839
SHARES
2.4k
VIEWS
Share on FacebookShare on Twitter

Gratomic Inc. executive chairperson Bruno Baillavoine says the Aukam Graphite Project will produce within four months if they receive funding.

The Canadian company is developing the Aukam Graphite Project in southern Namibia, near the port city of Luderitz. 

Baillavoine says it is more important to do the right rather than the quickest deal at this junction. 

“We expect Aukam to become profitable within 12 months of commencing production. This major objective will set Gratomic apart from many graphite producers,” he says.

He says the first objective is to secure the optimal funding necessary to complete the last element of the processing plant and provide operating capital. 

Gratomic has already acquired the stirred media mill, and the polishing mill, part of the refining circuit, is already on site and set up for production requirements. 

Additional pumps are available for immediate acquisition, and they need to connect the different circuits. 

The crushing circuit, the rod mill, and most flotation circuits have already been commissioned for commercial readiness before the refining, drying, and bagging circuits are commissioned.

According to Baillavoine, Gratomic has spent over US$30 million to build the plant and has no material debt.

Baillavoine says Gratomic Inc. has achieved many key milestones – so much so that it is on the cusp of moving from an exploration company to a fully-fledged mining company. 

He says achieving production at Aukam will fundamentally change the Gratomic Inc and enhance its value. 

“We successfully manoeuvred through our operational readiness to date and eliminated flaws. During this phase, several changes were made to the circuit, particularly to resonance time, flotation columns, slurry pumps, angles of cleat conveyors, stir media and polishing mill charge capacities, and tails management,” Baillavoine says. 

He adds that adjusting these sections of the processing plant at Aukam will optimize performance.

“We are currently exploring different avenues to fund this last element for Aukam, ‘the last brick in the wall,’ so to speak, which will enable us to meet our short- and mid-term milestones,” he says. 

The company is working towards completing a Feasibility Study on the Aukam Property. 

The study, its recommendations, and their subsequent implementation will provide conclusions and recommendations at a feasibility study level of comfort about scaling up the existing processing plant at Aukam to a commercial-scale processing facility capable of producing the desired concentrate grades and production rates.

The company has retained SP Angel Corporate Finance LLP of London, UK, to act as its Nominated Advisor and Broker in connection with the proposed admission of its securities to the Alternative Investment Market of the London Stock Exchange. 

Baillavoine commented, “We are very pleased to be working with SP Angel and preparing for a listing mid to late autumn 2024. As the leading mining NOMAD on AIM, they are doing an exceptional job for us and lining up a fascinating set of institutional contacts for Gratomic.”

 

 

Share336Tweet210
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

April 29, 2026
Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

April 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In