• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

UK-based Katoro Gold divorces TNMM over unclarified ownership of Namibian iron ore assets

by Editor
March 20, 2024
in News
0
UK-based Katoro Gold divorces TNMM over unclarified ownership of Namibian iron ore assets
565
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

The UK-based Katoro Gold has decided to cease any further investment in the Trans Namibian Mining & Minerals (TNMM) Iron Ore project in the Karas region of Namibia with immediate effect.
The project comprises four farms owned by TNMM, known as Naruchas, Kanubeb Wes, Kanubeb Oos and Kanubeb.
The JV targeted production capacity of 3Mtpa once all development work is completed.
In a statement issued on Tuesday, Katoro Gold says it sought evidence of the project’s ownership title as part of the conditions attached to the transaction, but TNMM has not been forthcoming.
Katoro Gold says it reserves its rights to pursue recovery of any amounts invested to date from third parties where it is appropriate to do so, albeit the amounts invested to date are very modest given the limited progress achieved.
Katoro Gold entered a binding conditional agreement with TNMM to form a 50/50 unincorporated joint venture in September 2022.
The joint venture sought to continue the development of TNMM’s iron ore project.
The agreement signed on September 20, 2022, provided Katoro with a preemptive right to acquire up to 60% of the total issued share capital of TNMM and the same percentage of all claims on the shareholder loan account against TNMM should the shareholders decide to sell their interest.
Under the agreement, Katoro was required to procure financing for the project’s and JV’s full funding requirements, including the construction and commissioning of a beneficiation plant and auxiliary operations, should the continued development and exploration work provide positive results.
Once the only remaining conditions had been met, the approval of a work programme and associated budget to advance the project to bankability status, the partners agreed to form an unincorporated JV to be held 50% by Katoro Gold and 50% by TNMM.
TNMM was required to make all technical data relating to the properties available to the JV, including but not limited to all geological data, feasibility studies, and geophysical and geochemical data in its possession.
TNMM was further required to provide the JV with customary warranties and undertakings regarding ownership of the properties.

 

Share226Tweet141
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

April 29, 2026
Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

April 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In