• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 9, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

    Forsys’ Norasa in the making

    Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

    Elizabeth Bay Mine in trouble again

    US$50m investment targets restart of Elizabeth Bay diamond mine

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Eureka gets N$12.9m development funding push

    ReeXploration plans Phase 2 drilling after a 16.7 m uranium hit at Eureka

    Hope and Gorob workforce reaches 130 as first ore nears

    Hope & Gorob starts commercial production, targets 9,000 tonnes in October

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas extends T-13 west with 22.6m at 6.01% CuEq

    Keras targets early copper production from Kaoko portfolio

    Keras targets early copper production from Kaoko portfolio

    Hope and Gorob to make N$1.95b net profit

    Hope and Gorob targets first copper shipment in November

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Graphite

Northern Graphite plans Okanjande mine restart in 2027

by Editor
April 21, 2026
in Graphite
0
Northern Graphite plans Okanjande mine restart in 2027
558
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Northern Graphite plans to restart the Okanjande Graphite Mine in 2027, targeting 31,000 tonnes per year (tpy) in Phase I as it positions the Namibian asset to supply feedstock to its planned Battery Anode Material (BAM) facility in Yanbu, Saudi Arabia, which is expected to begin production in 2028.

The restart is expected to be executed within one year of a construction decision, underpinned by a relatively low capital requirement of US$34.6 million and the advantage of the mine’s fully permitted status.

Okanjande, currently on care and maintenance, previously operated between 2017 and 2018 and already has water and power infrastructure in place.

Phase I production will draw from a 1.6 million tonne measured and indicated graphite resource, with the operation focused on producing battery-grade graphite concentrate.

The company is also planning a 19–20 megawatt on-site solar power plant, forming part of efforts to rebuild the mine as a lower-carbon operation aligned with evolving battery supply chain requirements.

Located approximately 288 kilometres from the Walvis Bay Port, Okanjande benefits from established road and rail links, allowing direct access to export markets and positioning it as a relatively low-cost, near-term supply option compared to greenfield graphite projects.

The asset has a long development history, with exploration dating back to the early 1990s, followed by first production in 2017. Operations were halted a year later, leaving the mine on care and maintenance despite its existing infrastructure and permits.

Northern says the restart strategy offers a shorter time-to-market, leveraging an existing processing footprint and a known orebody rather than developing a new mine from scratch.

The company has also flagged potential for modular expansion, indicating scope to increase production beyond the initial 31,000tpy, depending on market conditions.

The planned restart forms part of a broader vertical integration strategy linking upstream graphite production in Namibia with downstream processing in the Middle East, positioning Okanjande as a key supplier to the global battery materials market.

Share223Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Serval confirms copper mineralisation in Namibia’s Kaoko Basin

Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

October 9, 2026
Koryx hits 969m at 0.27% copper equivalent at Haib

Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

October 8, 2026
Forsys’ Norasa in the making

Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

October 8, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In