• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, October 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    China secures 60% of Etango uranium production

    China secures 60% of Etango uranium production

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Otavi REE assets drive Cazaly’s recent trading level of A$0.032

    Cazaly identifies two copper drilling targets at Abenab North

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

    Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

    Forsys’ Norasa in the making

    Asarian secures environmental approval for Norasa uranium project until 2029

    TotalEnergies warns delays will raise Venus oil project costs

    TotalEnergies warns delays will raise Venus oil project costs

    EU €1b funding package hangs in the balance after Namibia refused to sign the Samoa Agreement

    Walvis Bay to handle first 145,000-pound Malawi uranium shipment

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Andrada finds high-grade lithium beyond the main Lithium Ridge trend

by Editor
October 6, 2026
in Lithium
0
Andrada finds high-grade lithium beyond the main Lithium Ridge trend
514
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has confirmed high-grade lithium mineralisation outside the main Lithium Ridge trend in Namibia, opening additional exploration targets as the company and lithium major SQM continue drilling the project.

The latest results, representing the fifth batch of assays from the programme, include a standout intersection of 34.90 metres grading 1.02% lithium oxide (Li₂O) from a depth of 184.42 metres in drill hole LRD045. Within that interval was a higher-grade section of 6.22 metres at 1.67% Li₂O.

Andrada said the results confirm substantial down-dip continuity and structural thickening of pegmatite swarms at Lithium Ridge, while drilling has also demonstrated that mineralisation extends beyond the project’s established main trend.

Three holes — LRD064, LRD066 and LRD072 — intersected consistent high-grade mineralisation in a newly identified pegmatite outside the Lithium Ridge trendline.

LRD072 returned 14.25 metres at 1.42% Li₂O from 38.95 metres, including 8.23 metres grading 1.61% Li₂O. LRD066 intersected 11.35 metres at 1.16% Li₂O, including 4.64 metres at 1.79%, while LRD064 returned 11.12 metres at 1.11% Li₂O, including four metres at 1.73%.

The results provide drilling confirmation for targets where earlier grab sampling had indicated lithium potential, showing that the newly identified pegmatites continue below surface and retain significant lithium grades.

Andrada chief executive Anthony Viljoen said the latest drilling showed that the company was still determining the full extent of Lithium Ridge.

“This fifth batch of results demonstrates the presence of high-grade intersections confirming that we are still uncovering the full potential of the Lithium Ridge licence,” Viljoen said.

“Multiple pegmatites in this batch have returned intersections exceeding 1.5% Li₂O. These results also confirm that newly identified pegmatites beyond the main mineralised trend at Lithium Ridge also contain substantial lithium mineralisation. This highlights the upside potential that remains to be explored across the licence.”

The fifth batch comprises results from 23 drill holes that successfully intersected mineralisation, with lithium recorded from near surface to depths of as much as 275 metres.

Among the other significant results, LRD060 intersected 10.66 metres at 1.13% Li₂O from just 0.90 metres below surface, including 4.79 metres at 2.04% Li₂O.

LRD042 returned nine metres at 1.64% Li₂O from 63.83 metres, including 5.44 metres at 1.84%. Another interval in the same hole returned 9.89 metres grading 1.28% Li₂O.

LRD063 recorded 16.43 metres at 1.07% Li₂O, while LRD056 returned 5.41 metres at 1.18%, including 4.31 metres grading 1.46%.

The drilling is being conducted under Andrada’s Stage 1 earn-in agreement with SQM International, the Chilean lithium producer that is funding exploration as part of its strategic partnership with Andrada.

The results also reinforce the polymetallic character of Lithium Ridge. Tin and tantalum occur alongside lithium throughout a number of the pegmatites, raising the possibility that more than one mineral could eventually contribute to project revenues.

Among the reported intersections was 0.25 metres grading 1.03% tin and 227 parts per million tantalum in LRD061, while LRD074 returned 0.95 metres at 0.57% tin. LRD045 contained a 0.36-metre interval grading 604ppm tantalum.

Andrada said the potential production of several commodities could improve the economics and effective cost position of a future operation, although this remains subject to further metallurgical testing and economic evaluation.

Spodumene remains the principal lithium-bearing mineral identified in the drilling.

Not every hole produced significant mineralisation. Six holes — LRD058, LRD065, LRD076, LRD082, LRD095 and LRD101 — either failed to intersect significant pegmatites or returned intervals below Andrada’s minimum reporting thresholds.

The company said those holes remain useful because they help establish the boundaries of the mineralised pegmatites and refine the three-dimensional geological model needed for future resource delineation.

The latest results therefore serve two purposes for Andrada and SQM: strengthening evidence for continuity within the established Lithium Ridge system while providing drilling confirmation that mineralised pegmatites extend into areas outside the main trend.

Andrada said the additional targets will be investigated during the next stage of the project’s development.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Six Namibian contractors involved in Etango’s US$353m uranium mine construction

Six Namibian contractors involved in Etango’s US$353m uranium mine construction

October 29, 2026
China secures 60% of Etango uranium production

China secures 60% of Etango uranium production

October 29, 2026
Botswana’s Motheo copper mine produces 13,341 tonnes in three months

Botswana’s Motheo copper mine produces 13,341 tonnes in three months

October 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe