• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, August 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy proposes surrendering half of PEL 93

    Equinor targets ‘pretty big’ Namibia oil discovery

    Equinor targets ‘pretty big’ Namibia oil discovery

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada hits 24 metres at 2% lithium at Lithium Ridge

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy on NSX from Wednesday

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Graphite

Northern Graphite plans Okanjande mine restart in 2027

by Editor
April 21, 2026
in Graphite
0
Northern Graphite plans Okanjande mine restart in 2027
555
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Northern Graphite plans to restart the Okanjande Graphite Mine in 2027, targeting 31,000 tonnes per year (tpy) in Phase I as it positions the Namibian asset to supply feedstock to its planned Battery Anode Material (BAM) facility in Yanbu, Saudi Arabia, which is expected to begin production in 2028.

The restart is expected to be executed within one year of a construction decision, underpinned by a relatively low capital requirement of US$34.6 million and the advantage of the mine’s fully permitted status.

Okanjande, currently on care and maintenance, previously operated between 2017 and 2018 and already has water and power infrastructure in place.

Phase I production will draw from a 1.6 million tonne measured and indicated graphite resource, with the operation focused on producing battery-grade graphite concentrate.

The company is also planning a 19–20 megawatt on-site solar power plant, forming part of efforts to rebuild the mine as a lower-carbon operation aligned with evolving battery supply chain requirements.

Located approximately 288 kilometres from the Walvis Bay Port, Okanjande benefits from established road and rail links, allowing direct access to export markets and positioning it as a relatively low-cost, near-term supply option compared to greenfield graphite projects.

The asset has a long development history, with exploration dating back to the early 1990s, followed by first production in 2017. Operations were halted a year later, leaving the mine on care and maintenance despite its existing infrastructure and permits.

Northern says the restart strategy offers a shorter time-to-market, leveraging an existing processing footprint and a known orebody rather than developing a new mine from scratch.

The company has also flagged potential for modular expansion, indicating scope to increase production beyond the initial 31,000tpy, depending on market conditions.

The planned restart forms part of a broader vertical integration strategy linking upstream graphite production in Namibia with downstream processing in the Middle East, positioning Okanjande as a key supplier to the global battery materials market.

Share222Tweet139
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Uis emerges as southern Africa’s fourth most important tech-metals mine

Andrada turns cash positive, but loss widens to £10.7m

August 28, 2026
Bezant to seek permission to seal the Namib Lead deal

Bezant brings forward NLZM US$5m plant payment as Hope & Gorob targets September production

August 28, 2026
88 Energy targets 2026 for first exploration well in Owambo basin

88 Energy proposes surrendering half of PEL 93

August 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In