• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Graphite

Northern Graphite plans Okanjande mine restart in 2027

by Editor
April 21, 2026
in Graphite
0
Northern Graphite plans Okanjande mine restart in 2027
502
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Northern Graphite plans to restart the Okanjande Graphite Mine in 2027, targeting 31,000 tonnes per year (tpy) in Phase I as it positions the Namibian asset to supply feedstock to its planned Battery Anode Material (BAM) facility in Yanbu, Saudi Arabia, which is expected to begin production in 2028.

The restart is expected to be executed within one year of a construction decision, underpinned by a relatively low capital requirement of US$34.6 million and the advantage of the mine’s fully permitted status.

Okanjande, currently on care and maintenance, previously operated between 2017 and 2018 and already has water and power infrastructure in place.

Phase I production will draw from a 1.6 million tonne measured and indicated graphite resource, with the operation focused on producing battery-grade graphite concentrate.

The company is also planning a 19–20 megawatt on-site solar power plant, forming part of efforts to rebuild the mine as a lower-carbon operation aligned with evolving battery supply chain requirements.

Located approximately 288 kilometres from the Walvis Bay Port, Okanjande benefits from established road and rail links, allowing direct access to export markets and positioning it as a relatively low-cost, near-term supply option compared to greenfield graphite projects.

The asset has a long development history, with exploration dating back to the early 1990s, followed by first production in 2017. Operations were halted a year later, leaving the mine on care and maintenance despite its existing infrastructure and permits.

Northern says the restart strategy offers a shorter time-to-market, leveraging an existing processing footprint and a known orebody rather than developing a new mine from scratch.

The company has also flagged potential for modular expansion, indicating scope to increase production beyond the initial 31,000tpy, depending on market conditions.

The planned restart forms part of a broader vertical integration strategy linking upstream graphite production in Namibia with downstream processing in the Middle East, positioning Okanjande as a key supplier to the global battery materials market.

Share201Tweet126
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Northern Graphite plans Okanjande mine restart in 2027

Northern Graphite plans Okanjande mine restart in 2027

April 21, 2026
Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

Multi-project oil province forms as FID timelines align for 2026–2027

April 20, 2026
Hardwire oil wealth into law to avoid missed opportunity — McLeod

Hardwire oil wealth into law to avoid missed opportunity — McLeod

April 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In