• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, May 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Nasan Energies takes over divested Engen and Shell service stations

    Nasan Energies takes over divested Engen and Shell service stations

    TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

    Impact sheds South African assets to focus on Namibia’s Venus project

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Namibia turning explorers into market winners, says FitzGerald

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Namibia’s next multi-mineral growth province

    Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    Midas Minerals prepares to transition copper assets to full scale drilling

    Midas sells Australian project to invest in Otavi Copper-Gold Project

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    Kavango West-1X

    ReconAfrica secures permits for Kavango West oil flow testing in Namibia

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas Minerals hits 46.2m at 4.01% copper equivalent at Otavi’s T-13 deposit

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Gratomic faces cash flow pressures to move Aukam graphite project

by Editor
November 12, 2025
in Magazine
0
Gratomic faces cash flow pressures to move Aukam graphite project
510
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Canadian graphite developer Gratomic Inc., the company behind Namibia’s Aukam Graphite Project, continues to face financial strain despite maintaining full ownership and operational control of one of the country’s most advanced graphite assets.

The company’s latest unaudited interim financial statements for the nine months ended 30 September 2024 reveal persistent liquidity challenges, compounded by ongoing losses and delayed creditor settlements.

Gratomic, listed on the TSX Venture Exchange (GRAT), OTCQX (CBULF), and the Frankfurt Exchange (CB82), reported a net loss of C$1.84 million (approximately N$25.4 million) for the nine months and an accumulated deficit of more than C$92.4 million (N$1.27 billion).

The company acknowledged that its current cash on hand is insufficient to cover supplier obligations and anticipated expenditures for the next 12 months.

As a result, Gratomic stated that it would need to secure new financing to continue as a going concern.

Aukam Project central to the strategy

At the centre of Gratomic’s Namibian operations is the Aukam Graphite Project, located in the Bethanie district of the Karas Region.

The project consists of a Mining Licence (ML 215) covering 5,002 hectares and an Exclusive Prospecting Licence (EPL 8746) covering an additional 49,693 hectares.

Together, these licences give Gratomic full exploration and mining rights over a 55,000-hectare area prospective for graphite, base metals, and industrial minerals.

Gratomic owns the project through its Namibian subsidiaries Gratomic Graphite Mining Namibia (Pty) Ltd and Gratomic Graphite (Pty) Ltd.

The company achieved full ownership in July 2021 after acquiring the remaining 37% interest from Next Graphite Inc. for US$153,248 (about C$207,000 or N$2.85 million).

Under Namibian law, a 2% royalty is payable to the government on the value of minerals mined from Aukam, along with a 2% revenue royalty to the individual who farms the property.

As of September 2024, the carrying value of the Aukam exploration and evaluation assets stood at C$6.82 million (around N$94 million), unchanged from the previous year, while property and equipment—primarily plant infrastructure, vehicles, and processing facilities—had a book value of C$12.9 million (N$178 million). The company also recorded an environmental rehabilitation provision of C$608,706 (N$8.4 million), reflecting its estimated mine-site restoration costs at closure.

Cash flow and financing strains

The financial statements paint a picture of constrained cash flow. The company reported C$404,753 (N$5.6 million) generated from operating activities, but a negative working capital of C$6.49 million (N$89.4 million) at the end of the reporting period, with total current assets of less than C$1,000 (N$13,800). Gratomic also carried notes payable of C$1.41 million (N$19.4 million) from eleven shareholders, all unsecured and repayable on demand, alongside a separate note of US$153,243 (N$2.8 million) owed to Next Graphite Inc.

To sustain operations, the company continues to rely heavily on short-term loans and private placements. During 2023, Gratomic raised approximately C$4.6 million (N$63.3 million) through a series of private placements at C$0.30 per unit, each comprising one share and one warrant exercisable at C$0.45. However, no new shares or warrants were issued in 2024.

In April 2024, Gratomic granted 1 million stock options to Ndelineekela Helao Shivolo, its Namibian government liaison consultant, exercisable over a five-year period. A further 1.5 million options were issued in July 2024 to Executive Chair Bruno Baillavoine at strike prices of C$0.20 and C$0.30, bringing total outstanding options to 13.02 million.

Legal and operational risks

The company continues to face legal and operational risks in Namibia. A C$175,000 (N$2.4 million) legal settlement owed to a group of consultants, due on 31 October 2024, remained unpaid at the time of reporting. Gratomic confirmed it was seeking revised payment terms to avoid judgment costs that could exceed C$210,000 (N$2.9 million), including interest and legal fees.

Gratomic’s going-concern statement acknowledges “material uncertainty” over its ability to continue operating without additional funding. The company cited “challenging capital markets for junior resources companies” and “cumulative operating losses” as significant constraints.

Broader context and outlook

Despite these challenges, Gratomic continues to promote the Aukam Graphite Project as a near-term supply source for the global battery and electric-vehicle (EV) industries.

The mine, located roughly 200 kilometres east of Lüderitz, contains a historic open-pit operation first mined in the 1940s. The company has refurbished processing facilities and installed pilot-scale equipment to produce high-purity vein graphite concentrate suitable as an anode material.

However, Gratomic has yet to publish a Preliminary Feasibility Study (PFS) or mineral resource estimate for Aukam, meaning independently verified economic data do not yet support current operations.

The company acknowledged that production decisions have not been based on a completed feasibility study, adding that this “increases the uncertainty of achieving any particular level of recovery or cost of production.”

While Gratomic continues to describe its Namibian project as its “flagship operation,” its survival now depends on raising new equity or debt financing.

As the global graphite market tightens and Namibia pursues greater beneficiation of its critical minerals, Gratomic’s financial recovery will hinge on its ability to turn the Aukam asset from an exploration story into a sustainable producer.

If financing is secured and graphite production commences as planned, Aukam could yet reassert itself as a strategic graphite source for both Namibia and the growing clean-energy supply chain — but until then, Gratomic remains under intense financial pressure.

Share204Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Nasan Energies takes over divested Engen and Shell service stations

Nasan Energies takes over divested Engen and Shell service stations

May 27, 2026
TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

Impact sheds South African assets to focus on Namibia’s Venus project

May 26, 2026
Kaoko Metals launches IPO to fund copper exploration in northern Namibia

Namibia turning explorers into market winners, says FitzGerald

May 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In