• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, November 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

    Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

    Haib placed third among major low-grade copper producers

    Haib placed third among major low-grade copper producers

    Okavango Diamond Company earns US$645 million from Botswana diamond sales

    Okavango Diamond Company earns US$645 million from Botswana diamond sales

    Jacaranda reports A$7.3 million cash to fund Botswana gold exploration

    Jacaranda reports A$7.3 million cash to fund Botswana gold exploration

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Khama warns Botswana could wait years for De Beers dividends

    Khama warns Botswana could wait years for De Beers dividends

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow blames weak share price for Tumas uranium delay

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Jacaranda raises P78m, prepares to drill Botswana gold project

by Editor
October 28, 2026
in Gold
0
Jacaranda raises P78m, prepares to drill Botswana gold project
510
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Australian-listed Jacaranda Natural Resources is preparing to begin drilling at its Globe Gold Project in Botswana within days after raising approximately P78 million (A$8 million) through an initial public offering (IPO), giving the company funding to explore its gold and copper-nickel projects in the country.

The company announced its debut on the Australian Securities Exchange (ASX) following the successful issue of shares at approximately P1.95 (A$0.20) each, with about P68.2 million (A$7 million) in cash available to finance exploration activities across Botswana and Australia over the next 24 months.

Jacaranda’s immediate focus in Botswana is the Globe Gold Project in the Tati Greenstone Belt, where a drilling rig is expected to arrive shortly for an initial programme of eight diamond drill holes covering approximately 540 metres.

The programme will investigate previously identified gold mineralisation, including historical drilling results of three metres grading 5.17 grams per tonne of gold from a depth of nine metres.

Rock-chip samples collected at the historic Globe Shaft also returned gold grades of up to 26.5 grams per tonne, although these historical results do not establish the size or economic viability of a deposit.

Jacaranda chief executive Craig Hatch said the company was ready to begin exploration at Globe following its listing.

“In Botswana, the rig is due on site at Globe in the next few days to drill our most advanced gold target,” Hatch said.

The initial drilling campaign will concentrate on the highest-priority areas identified through previous exploration, with the results expected to guide further investigations.

Jacaranda plans to combine validated historical trenching information with geological interpretation and induced polarisation geophysical surveys to identify additional drilling opportunities.

The company has not announced a mineral resource estimate for Globe, and the forthcoming drilling will be required to establish the extent and continuity of the previously identified gold mineralisation.

More than 2,500km² under exploration

Beyond Globe, Jacaranda holds the Motloutse and Nkwe projects, which collectively cover more than 2,500 square kilometres in Botswana’s Limpopo Mobile Belt.

These projects are being explored primarily for copper-nickel sulphide mineralisation, with the company identifying opportunities in areas that have experienced limited modern exploration since the 1970s to 1990s.

Hatch said the extensive landholding offered opportunities for systematic exploration using modern geological and geophysical techniques.

“At White Cockatoo, we have more than twenty untested high-grade shallow targets and multiple potential intrusive/porphyry system targets that have never been drill-tested, and at Motloutse and Nkwe we hold district-scale ground that has seen no commercial-scale exploration since the 1970s-90s. Our focus now is disciplined, results-driven exploration across the portfolio,” he said.

The geological potential of the region is illustrated by established copper-nickel deposits elsewhere in the Limpopo Mobile Belt, including Selebi North, Selebi Main and Sunnyside.

According to resource estimates referenced by Jacaranda, Selebi North contains an indicated resource of 8.95 million tonnes grading 1.03% copper and 1.08% nickel, alongside an inferred resource of 9.48 million tonnes grading 1.21% copper and 1.13% nickel.

Selebi Main has an inferred resource of 32.47 million tonnes grading 1.53% copper and 0.98% nickel, while Sunnyside contains an estimated 3.7 million tonnes grading 0.22% copper and 0.36% nickel.

These are third-party mineral resources belonging to other projects and are not attributable to Jacaranda. The company has also cautioned that mineralisation identified on neighbouring properties does not necessarily indicate similar deposits within its own exploration licences.

Jacaranda intends to use the regional geological information to guide exploration across Motloutse and Nkwe.

At Motloutse, the next phase will involve geological mapping and systematic surface sampling to identify areas requiring further investigation.

Work at Nkwe will include field reconnaissance, geological mapping and targeted rock-chip, soil and stream-sediment sampling, supported by a review of historical exploration information and remote-sensing data.

The company expects these activities to help identify priority exploration areas before committing to more detailed investigations.

IPO funds two-year exploration programme

Jacaranda raised approximately P78 million (A$8 million) through its IPO, with the offer managed by Gaia Capital and Boston Global.

The capital raising included cornerstone investments of approximately P24.3 million (A$2.49 million) from Ever-Sun Development (Hongkong) Limited and P6.8 million (A$700,000) from existing shareholder Purebond Limited.

Following the listing, Jacaranda reported approximately P68.2 million (A$7 million) in pro-forma cash to support its planned 24-month exploration programme across Botswana and Queensland, Australia.

Founder and executive chairman Arvind Misra said the listing marked the beginning of the company’s programme to explore its copper and gold assets.

“We founded Jacaranda with a clear objective: to deploy shareholders’ capital into high-quality copper and gold exploration opportunities where successful discovery can create substantial value,” Misra said.

He said the company was beginning operations with sufficient funding, an experienced management team and drilling preparations already underway in Botswana.

Jacaranda’s Botswana operations are overseen by country manager Kago Stimela, while chief executive Hatch brings previous experience from the development of the Khoemacau Zone 5 copper project in Botswana.

The company’s Australian portfolio includes the White Cockatoo Copper-Gold Project in Queensland, where drilling is planned for early 2027. However, its first drilling programme following the ASX listing is scheduled to take place at Globe in Botswana.

The immediate priority will be to complete the eight-hole drilling campaign at Globe and use the results to determine whether additional drilling and geophysical investigations are warranted.

Exploration at Motloutse and Nkwe will proceed alongside the Globe programme, with the company seeking to identify new copper-nickel prospects across its extensive Botswana landholding.

Jacaranda has not announced commercial mineral discoveries or mineral resources attributable to its Botswana projects, and further exploration will be required to determine whether the identified opportunities can support future mining developments.

Share204Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
COP31 puts three years of climate commitments to the test

COP31 puts three years of climate commitments to the test

November 21, 2026
Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

November 21, 2026
Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

November 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe