• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, June 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

TerraWatt breaks ground on 50MW Astra Farm solar project in Omaheke

by Editor
November 10, 2025
in News
0
TerraWatt breaks ground on 50MW Astra Farm solar project in Omaheke
527
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The Deputy Minister of Industries, Mines and Energy, Gaudentia Kröhne, has hailed the groundbreaking of the 50MW Astra Farm Solar Project in Omaheke as a defining moment in Namibia’s clean energy transition and industrial growth strategy.

Speaking at the ceremony on Friday, Kröhne described the project as “a symbol of transition, of hope, of collaboration, and of Namibia’s ambition to become a leader in renewable energy on the African continent.”

She commended TerraWatt’s Dutch and Namibian teams for investing in Namibia’s future and “placing confidence in our people, institutions and land.”

The Astra Farm project, developed by TerraWatt in partnership with Rare Earth Minerals as the offtaker, marks one of the largest private-sector renewable investments in the Omaheke region.

The solar park is expected to generate clean and reliable power, create local employment, and stimulate rural economies while reducing carbon emissions in line with Namibia’s climate goals.

Kröhne said the initiative underscores the government’s vision to transform the energy sector into a pillar of sustainable development under the Sixth National Development Plan (NDP6).

“Energy remains the most critical input for development. “We must continue to harness locally available resources for the benefit of all Namibians,” she said.

Namibia, she noted, boasts the world’s second-best solar resource, vast biomass reserves, and a strong wind regime — advantages that position the country to meet its renewable energy generation targets.

“It is imperative that we continue to plan, structure, manage, and develop an energy sector that can support our aspirations, both today and in the future,” Kröhne said.

She called on the private sector to continue investing in renewable projects, promising that the ministry will “create an enabling environment through sound, transparent and progressive policies.”

Closing her remarks, Kröhne said the ceremony represented “more than the start of a construction project — it is the beginning of a brighter chapter in Namibia’s energy journey.”

She urged all stakeholders to approach the task “with unity, discipline, and care,” declaring the 50MW Astra Farm Solar Project officially underway.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Tower Resources waits on final Namibia approval as Prime Global farm-out nears completion

June 24, 2026
Cazaly Resources starts drilling at Kaoko lithium project

Cazaly secures access to Cadix farm area, targets 3Q 2026 for maiden drilling at Abenab North

June 23, 2026
Tantalite Valley waiting for exploitation

Kazera agrees US$10.5m deal to end Aftan payment dispute

June 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In