• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, November 18, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Khama warns Botswana could wait years for De Beers dividends

    Khama warns Botswana could wait years for De Beers dividends

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow blames weak share price for Tumas uranium delay

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Impact Oil & Gas pays Africa Oil US$31.6 million dividend from TotalEnergies Orange Basin farm-down deal

    Impact separates South African assets to concentrate on Namibia’s Venus oil project

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    NDP6 – Five mines to power a nuclear future by 2030

    Bannerman reserves 40% of Etango uranium for buyers outside Chinese partnership

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Paladin spends US$11m building uranium stockpiles at Langer Heinrich

by Editor
October 22, 2026
in Uranium
0
Paladin spends US$11m building uranium stockpiles at Langer Heinrich
507
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Paladin Energy spent approximately US$11 million building low-grade uranium ore stockpiles at its Langer Heinrich mine in Namibia during the September 2026 quarter, setting aside material for processing during a later phase of the operation.

The expenditure, disclosed in the company’s quarterly results presentation released on 14 October, forms part of the investment being made in the mine as Paladin continues to develop its open pits and prepare ore for future processing.

The US$11 million was separate from approximately US$67 million spent on production and selling costs and US$15 million allocated to stripping activities and sustaining capital at Langer Heinrich during the three months ended 30 September.

According to the presentation, the mine placed approximately 480,000 tonnes of low-grade ore into stockpiles during the quarter, compared with 920,000 tonnes in the preceding quarter.

The material is being retained for processing during a later stockpile phase rather than being immediately fed through the uranium processing plant.

Langer Heinrich mined a total of 7.73 million tonnes of material during the quarter, up from 7.45 million tonnes in the June quarter. This included 5.89 million tonnes of waste and 1.84 million tonnes of ore.

Mining activities remained focused on developing the J pit, where work is progressing towards the main orebody while topsoil and waste are removed to provide access to primary uranium-bearing material.

Paladin said ore characteristics associated with the mining sequence affected processing performance during the quarter, with recovery declining to 85% from 90% in the preceding three months.

The processing plant treated 1.17 million tonnes of ore, compared with 1.19 million tonnes previously, while uranium production fell from 1.23 million pounds to 1 million pounds.

The company expects improvements in ore grade and metallurgical recovery as mining advances into the lower southern benches of the J pit, which it anticipates will support higher production and lower costs per pound over the remainder of the 2027 financial year.

Production costs increased to US$61.60 per pound during the September quarter, compared with US$51.60 per pound in the June quarter.

Despite the lower output, Paladin maintained its full-year production guidance of between 5.1 million and 5.6 million pounds of uranium oxide, with sales expected to range between 4.8 million and 5.3 million pounds.

The company also expects production costs to average between US$44 and US$48 per pound for the financial year.

Langer Heinrich sold 1.16 million pounds of uranium during the September quarter at an average realised price of US$79.40 per pound, compared with 1.35 million pounds at US$70.60 per pound in the preceding quarter.

The stronger selling price reflected higher uranium prices and a greater proportion of sales linked to market-related pricing arrangements.

Paladin’s quarterly cash-flow statement also showed approximately US$19 million spent on its Patterson Lake South project and group exploration activities, alongside the expenditure at Langer Heinrich.

The company ended September with US$209 million in cash and investments and an undrawn US$70 million revolving credit facility.

Paladin owns 75% of Langer Heinrich, with the mine representing its operating uranium production asset in Namibia.

The low-grade stockpile expenditure highlights an additional component of the mine’s operating cash requirements beyond immediate uranium production, as material mined today is retained for processing in a later phase of the operation.

Share203Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

November 18, 2026
Namibia showcases US$212m industrial projects at COP31

Namibia showcases US$212m industrial projects at COP31

November 18, 2026
Khama warns Botswana could wait years for De Beers dividends

Khama warns Botswana could wait years for De Beers dividends

November 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe