• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, October 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

    Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

    Forsys’ Norasa in the making

    Asarian secures environmental approval for Norasa uranium project until 2029

    TotalEnergies warns delays will raise Venus oil project costs

    TotalEnergies warns delays will raise Venus oil project costs

    EU €1b funding package hangs in the balance after Namibia refused to sign the Samoa Agreement

    Walvis Bay to handle first 145,000-pound Malawi uranium shipment

    Elevate considers developing Marenica, Koppies simultaneously

    Elevate seeks ratification of 4.7m shares issued to Xanthos in Marenica deal

    Namibia’s next multi-mineral growth province

    Chinalco’s US$15m Opuwo acquisition awaits Namibia, China approvals

    Hartree puts US$5m behind Hope and Gorob plant deal

    Bezant secures £4m to support Hope and Gorob production and expansion

    Amutse wants Etango uranium production before 2028

    Amutse wants Etango uranium production before 2028

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Elevate moves Koppies into technical validation

by Editor
November 3, 2025
in Magazine
0
Elevate moves Koppies into technical validation
524
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The arrival of the U-pgade™ demonstration plant marks the tail-end of Elevate Uranium’s current phase of work in Namibia — a sequence designed to move the Koppies Project from exploration into technical validation rather than immediate production.

The plant, scheduled to operate around late 2025, will take the company’s proprietary beneficiation process from laboratory bench-scale to continuous pilot testing, confirming how the technology performs on Namibian ore and providing design data for future commercial planning.

Once that phase is complete, Elevate intends to undertake the detailed engineering, environmental and economic studies required before any development decision.

While some in the industry view Koppies as a potential addition to Namibia’s uranium production portfolio before 2030, the company itself has not committed to that timeline.

For now, its strategy remains focused on de-risking — expanding resources, validating process technology and ensuring that when a Final Investment Decision eventually comes, it rests on sound technical and market foundations.

Elevate Uranium, formerly Marenica Energy, has been active in Namibia since at least the late 2000s through Marenica Minerals (Pty) Ltd, which holds the 75%-owned Marenica Uranium Project (MDRL 3287) in the Erongo region. The licence covers about 321 km² and anchors the company’s Namib strategy alongside newer discoveries at Koppies, Hirabeb and Namib IV within its Namib project area.

The company’s Namibian inventory grew by pegging and exploring its own EPLs rather than buying operating mines.

Koppies (EPL 6987) lies within the Namib Desert uranium corridor, approximately 65 kilometres northeast of Swakopmund and 20 kilometres south of the Langer Heinrich Mine. The deposit occurs in shallow, calcrete-hosted mineralisation within palaeochannels, making it highly amenable to low-cost surface mining. Elevate Uranium wholly owns Koppies and has been the flagship for the company’s proprietary U-pgade™ processing technology.

The U-pgade™ process is a beneficiation technology developed by Elevate to concentrate uranium minerals before leaching.

It works by rejecting carbonate-rich and silica gangue material from calcrete-hosted ore, reducing the mass that must be processed by 80–85 per cent and lowering acid consumption by 50–70 per cent compared to conventional leach circuits.

Pilot tests on Marenica and Koppies material achieved uranium grade increases of three- to five-fold while cutting downstream plant size and reagent use proportionally in practical terms, which translates into a potential 50–60 per cent reduction in operating costs and a markedly smaller environmental footprint—an approach particularly suited to Namibia’s surficial uranium deposits, such as Koppies and Marenica.

The deposit’s mineralisation extends over roughly 13 kilometres of channel length, and about 78 per cent of the current 66.1 Mlb resource is now classified as Indicated under JORC 2012, confirming strong geological confidence.

The Koppies resource currently stands at 55.9 Mlb U₃O₈ within the main deposit and 10.2 Mlb U₃O₈ at the nearby Hirabeb zone, taking the wider Koppies Project total to 66.1 Mlb U₃O₈.

Mineralisation at Koppies and Hirabeb remains open in several directions, and both are part of a broader system of surficial uranium enrichment stretching across the Namib Desert.

Koppies was the first of these Namib Desert tenements to be systematically drilled, culminating in an October 2024 upgrade that lifted the Koppies deposit to 55.9 Mlb U₃O₈ and, with a maiden 10.2 Mlb at nearby Hirabeb, took the wider Koppies Project to 66.1 Mlb. That same update put Elevate’s total Namibian resource base at 112.1 Mlb U₃O₈.

Hirabeb (EPL 7278) lies directly south of Koppies and covers approximately 730 km². It hosts the newly defined 10.2 Mlb U₃O₈ inferred resource and represents a high-priority exploration growth area.

Drilling has confirmed strong continuity of mineralisation, with uranium grades extending laterally into weathered basement zones adjacent to the palaeochannel network.

Namib IV (EPL 7662), discovered in 2021 and revisited in late 2024 after the Koppies workstream, has since returned broad mineralised envelopes up to 11 km by 7.5 km and is being drilled toward a maiden resource.

The company’s exploration model has evolved to include both surficial and basement-hosted uranium styles.

Elevate has occasionally added ground by acquisition.

In 2018, then-Marenica bought the Mile 72 Project from Metals Australia for A$30,000 cash plus a 1% gross production royalty — modest in scale but illustrative of how it assembled options around its core licences.

The significant Namib holdings at Koppies, Hirabeb and Namib IV, however, were secured through the company’s own applications and exploration.

Since 2024, the technical focus has been twofold: grow resources and prove up the U-pgade™ beneficiation route on Namib surficial ores. Bench-scale testwork on bulk samples from Koppies is complete, and Elevate has moved to a demonstration stage in Namibia.

The company says a Koppies U-pgade™ demonstration plant is scheduled to operate in Namibia around late 2025, stepping from bench work into continuous pilot-scale proof to inform design and economics.

Recent local reports flagged shipping delays but confirmed the pilot’s imminent assembly and commissioning.

To fund that plan and more drilling, Elevate raised A$25 million (N$312 million) at A$0.35 per share on 31 October 2025, lifting pro-forma cash to about A$43.9 million (N$548 million).

The placement was pitched to accelerate the U-pgade™ pilot programme, resource definition and expansion drilling across Namibia, and supporting technical studies.

How significant are the Namibian assets today?

On the public numbers: Koppies deposit 55.9 Mlb U₃O₈; Hirabeb 10.2 Mlb U₃O₈; total Koppies Project 66.1 Mlb U₃O₈; total Namibia 112.1 Mlb U₃O₈ (October 2024 basis).

The company also retains the legacy Marenica Uranium Project (MDRL 3287) resource of roughly 61 Mlb U₃O₈ (Elevate share ~46 Mlb). It is drilling Namib IV toward a first estimate to add to that 112.1 Mlb tally potentially.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Golden Deeps four critical metals find

Golden Deeps reports 23.2% zinc, 9.2% copper at Graceland as deeper drilling continues

October 28, 2026
Jacaranda raises P78m, prepares to drill Botswana gold project

Jacaranda raises P78m, prepares to drill Botswana gold project

October 28, 2026
Column – Seizing the critical minerals moment will be Africa’s path to industrialisation

Column – Seizing the critical minerals moment will be Africa’s path to industrialisation

October 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe