• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, April 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Galp and partners find ‘significant column of light oil’ on Mopane-2X in the Orange Basin

    Sintana moves to list on NSX, opens offshore oil play to Namibians

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Graphite

Gratomic needs N$63m to push output to 12,000t at Aukam graphite project

by Editor
November 19, 2023
in Graphite
0
Gratomic needs N$63m to push output to 12,000t at Aukam graphite project
535
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Gratomic Inc. would need C$4,7m (about N$63m) capital expenditure on the Aukam Graphite facility to push output to 12,000 tonnes by November 2024.
The multinational company with projects in Namibia, Brazil, and Canada commissioned the Aukam project at the end of June 2023.
The Aukam project is in southern Namibia, close to the port city of Luderitz in the Karas Region.
The property, covering 137,473 hectares under EPLs 3895, EPL 6710, EPL 7512, and EPL 7513, is on farm Aukam 104 and Harichab 121.
Since the commissioning of the project, Gratomic has processed 80 tonnes of material through the processing plant at a grade of 94% Cg concentrate, which is being stored on-site in the storage silos.
The capital needed will push the output of the Aukam project from the current kick-off level of 7,600 tonnes.
Gratomic says it has stockpiled enough mined material to feed operations for a year.
Once the final pieces of equipment are in place, the company will start producing graphite steadily, expanding until a 22,500-tonne capacity is achieved in 2025.
The plant is expected to start production in the first quarter of 2024, with the initial product sold to a European Carbon trader until the product is successfully included in the anode market.
Gratomic signed a letter of intent with Graphex Technologies on 25 January 2023 to supply graphite and develop a downstream processing facility in the US.
The company signed another agreement with Forge Nano in 2021 to build a pilot facility to internally process up to 1,000 tonnes of SG16 battery-grade anode materials.
In June 2023, Gratomic announced a commercial partnership and sales agreement with TM2 Verticals to supply purified flake graphite from the Aukam project to the alkaline battery sector.
Gratomic also partnered with Suntech Labs of South Africa to upgrade the Aukam graphite concentrate to the 96% grade the original equipment manufacturers (OEMs) require.
A pilot project produced about 700 kilograms of minimum 96% grade concentrate samples for the global alkaline battery producers.
Arno Brand, President and CEO of Gratomic said the past few months have been challenging and time-consuming.
“It is with great relief that we now see ourselves in the final steps in production preparation at the Aukam Graphite mine in Namibia.”

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
NJ Ayuk urges IOCs to invest in Namibia

NJ Ayuk urges IOCs to invest in Namibia

April 19, 2026
Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

April 17, 2026
Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

April 17, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In