• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, September 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    TotalEnergies towards 2026 – what is left?

    TotalEnergies leaves Venus FID date out as it sanctions Azerbaijan project

    Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

    Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica finds gas with liquid potential at Kavango well

    Tower Resources bets big on Walvis Basin potential

    Tower Resources’ PEL96 farm-out reaches minister for final signature

    Kombat workforce reaches 429, could grow to 600 by year-end

    Kombat workforce reaches 429, could grow to 600 by year-end

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

African Pioneer engages advisors to update Ongombo open-pit mineral resource estimate

by Editor
October 8, 2025
in Copper
0
African Pioneer gets licence for Ongombo Copper-Gold Project
538
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

African Pioneer has engaged external mining and resource advisors to update the open-pit mineral resource estimate and advise on infill drilling to expand the global resource.

Planning discussions continue with a preferred mining contractor for both open-pit and underground mining, with a focus on building a cost database to refine the financial model.

The developments follow the company’s receipt of official confirmation of Mining Licence No. 240 for its 85%-owned Ongombo Copper-Gold Project, located approximately 40 kilometres northeast of Windhoek in Namibia’s Khomas Region.

The licence, which is valid until March 2045, marks the completion of the government permitting process following the earlier approval of the Environmental Clearance Certificate in March 2025.

The Ongombo project, located within Exclusive Prospecting Licence (EPL) 5772, covers part of the farms Ongombo Ost and Ongombo West.

It lies just 15 kilometres from the historic Otjihase and Matchless copper mines, which share similar geological characteristics.

The deposit is hosted within the Matchless Member of the Kuiseb Formation—part of the Damara Orogen—and is classified as a Besshi-type massive sulphide system, consisting of sheet-like bodies of pyrite, pyrrhotite and chalcopyrite.

According to an independent resource estimate, Ongombo holds a gross Indicated Mineral Resource of 5.7 million tonnes at 1.1% copper equivalent (0.94% Cu and 0.23 g/t Au) and a further Inferred underground potential resource of 23 million tonnes at 1.1% CuEq (0.95% Cu and 0.24 g/t Au).

The mineralised zone extends approximately seven kilometres in length and between half a kilometre and one kilometre in width, dipping gently northwest and gradually thinning westward.

African Pioneer is also assessing nearby concessions with known resources and potential access synergies.

The company believes the Ongombo project could be expanded through collaboration or acquisition to create a broader production base in central Namibia.

With all regulatory approvals in place, Ongombo now moves into its next phase—finalising technical and financial parameters for mine development.

The company is in advanced discussions with multiple parties regarding project-level funding, positioning the copper-gold venture as one of Namibia’s most promising emerging mines.

Colin Bird, Executive Chairman of African Pioneer, stated that the project’s steady progress reflects the company’s commitment to establishing a viable operation in a reliable jurisdiction.

“Ongombo represents not only an opportunity for near-term copper-gold production but also a strategic platform for regional growth in Namibia,” Bird said.

Share215Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
TotalEnergies towards 2026 – what is left?

TotalEnergies leaves Venus FID date out as it sanctions Azerbaijan project

September 29, 2026
Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

September 28, 2026
ReconAfrica targets October for 1,000m horizontal test at Kavango West

ReconAfrica finds gas with liquid potential at Kavango well

September 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In