• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, October 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

    Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

    Forsys’ Norasa in the making

    Asarian secures environmental approval for Norasa uranium project until 2029

    TotalEnergies warns delays will raise Venus oil project costs

    TotalEnergies warns delays will raise Venus oil project costs

    EU €1b funding package hangs in the balance after Namibia refused to sign the Samoa Agreement

    Walvis Bay to handle first 145,000-pound Malawi uranium shipment

    Elevate considers developing Marenica, Koppies simultaneously

    Elevate seeks ratification of 4.7m shares issued to Xanthos in Marenica deal

    Namibia’s next multi-mineral growth province

    Chinalco’s US$15m Opuwo acquisition awaits Namibia, China approvals

    Hartree puts US$5m behind Hope and Gorob plant deal

    Bezant secures £4m to support Hope and Gorob production and expansion

    Amutse wants Etango uranium production before 2028

    Amutse wants Etango uranium production before 2028

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Cazaly waits for licence to begin Abenab North exploration

by Editor
September 24, 2025
in Magazine
1
Cazaly waits for licence to begin Abenab North exploration
514
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Cazaly Resources is awaiting the granting of licences for its Abenab North Rare Earth Elements and Base Metals Project in northern Namibia.

This step would enable the company to commence modern exploration in one of the country’s most historically rich mining regions.

Located in the Otavi Mountain Land, approximately 450 kilometres north of Windhoek, the Abenab North project spans roughly 790 square kilometres under Prospecting Licence application EPL 9852, of which Cazaly holds a 95% interest.

The licence application has reached the “notification of intention to grant” stage, signalling that Namibia’s Ministry of Mines and Energy is likely to issue approval once environmental requirements are met.

To proceed, Cazaly must first secure an Environmental Clearance Certificate (ECC), which depends on the finalisation of an Environmental and Social Impact Assessment (ESIA) and an Environmental Management Plan (EMP).

These processes involve community consultation and environmental safeguards, and while they can take time, they are a prerequisite for all mining and exploration activity in Namibia.

The Abenab North area is geologically significant. It sits in a province that has hosted some of Namibia’s most storied mines, including Tsumeb, Kombat, Abenab and Berg Aukas.

Historic data points to multiple carbonatite intrusions associated with rare earth mineralisation, with older drill records reporting encouraging intervals such as 45 metres grading 0.73% total rare earth oxides.

While these figures are not compliant with modern reporting standards, they provide a strong incentive for new exploration.

To date, however, Cazaly has not conducted its own drilling at Abenab North.

The company has compiled and reviewed the historical datasets, but cannot commence on-ground exploration until the licence and ECC are formally granted.

As such, no JORC-compliant resource has yet been defined.

Cazaly has positioned Abenab North as its Namibian flagship after withdrawing from the Kaoko Lithium Project earlier this year, choosing instead to focus on commodities that align with global demand for critical minerals.

Rare earth elements such as neodymium and praseodymium are essential for renewable energy technologies, electric vehicles, and electronics, giving projects like Abenab North heightened strategic importance.

The company’s Namibian presence was first established through acquisition options in 2017 and 2018, when it struck deals to secure cobalt and copper ground at Tsumkwe and Kaoko.

The Tsumkwe option, signed on 19 December 2017 with Gemco Investments, involved an upfront cost of about A$1.3 million in cash and shares, with further milestones including the issue of up to 10.5 million shares and a payment of A$1 million on a decision to mine.

In March and April 2018, Cazaly expanded this strategy with the Kaoko Kobalt Project, where terms again required share issues and exploration expenditure of around N$3 million.

However, these projects failed to deliver the expected results, and by 2025, Cazaly had written off much of the expenditure and formally exited Kaoko.

The shift has left Abenab North as the centrepiece of Cazaly’s Namibian ambitions.

The company has indicated it is already reviewing geophysical datasets and historical maps to refine drill targets. Once the licence is formally granted and environmental approvals are in place, Cazaly plans to commence fieldwork and drilling to verify and expand on past results.

The development of Abenab North would add to Namibia’s growing profile as a supplier of critical minerals and it marks a narrowing of focus on projects that offer both geological pedigree and potential to plug directly into the energy transition economy.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

October 27, 2026
Forsys’ Norasa in the making

Asarian secures environmental approval for Norasa uranium project until 2029

October 26, 2026
TotalEnergies warns delays will raise Venus oil project costs

TotalEnergies warns delays will raise Venus oil project costs

October 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe