• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, May 2, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Uncategorized

Bannerman secures first uranium offtake agreements Bannerman signs Namibia’s first uranium offtake agreements with North American utilities

by Editor
September 5, 2025
in Uncategorized
0
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Bannerman Energy Ltd has become the first company operating in Namibia to conclude uranium offtake agreements with North American utilities.

The company has executed binding contracts with two Tier-1 power generators for the supply of one million pounds of uranium over a five-year period, from 2029 to 2033.

The counterparties are Fortune 500-listed utilities with investment-grade credit ratings and nuclear generation capacity. Each agreement allows the utility to adjust deliveries by up to 10 per cent annually.

The uranium will be supplied from Bannerman’s Etango Project in Namibia’s Erongo Region, where production is scheduled to commence in 2028.

Both contracts are structured as base-price agreements with escalation provisions tied to the US GDP-Implicit Price Deflator, effective from the start of the supply term.

The base price reflects current levels of long-term uranium indices.

Each agreement remains subject to regulatory approvals for uranium sales.

Chief Executive Officer Gavin Chamberlain said:

“The signing of these limited, select offtake agreements with high-quality utility counterparties represents a further important step in our systematic advancement of Etango towards a targeted Final Investment Decision. We are able to demonstrate to potential customers a strong foundation for confidence in our ability to meet future supply commitments.

“In combination with growing global nuclear demand and ongoing tightening in uranium markets, this further reinforces our position as a strategic, long-term supplier to major utilities,” he said.

The Etango Uranium Project contains Ore Reserves of about 61 million pounds of U₃O₈ and a broader Mineral Resource exceeding 200 million pounds.

In December 2022, a Definitive Feasibility Study confirmed the Etango-8 development plan, based on an eight million tonne per annum processing scale and annual output of about 3.5 million pounds of U₃O₈.

A March 2024 scoping study outlined potential expansion to 6.7 million pounds per year.

Bannerman constructed and operated a heap leach demonstration plant to de-risk the planned processing method.

All environmental approvals for Etango and its infrastructure have been granted. The project was awarded a mining licence in December 2023. Production is scheduled to begin in 2028.

Namibia is the world’s third-largest uranium producer, with three operating mines: Rössing, Husab, and Langer Heinrich.

By 2030, the sector is expected to expand to six operating uranium mines, including Bannerman’s Etango, Deep Yellow’s Tumas Project, and Elevate Uranium’s Koppies Project.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In