• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, June 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Gratomic returns to Aukam as restart efforts gather pace

by Editor
September 1, 2025
in Magazine
0
Gratomic Inc says Aukam Graphite Project could produce within 4 months if funds are available
849
SHARES
2.4k
VIEWS
Share on FacebookShare on Twitter

Gratomic Inc. has resumed activity at its Aukam Graphite Mine in southern Namibia, mobilising staff on August 23, 2025, for the first time this year.

The move follows a difficult stretch marked by reporting delays, financial strain, and leadership changes.

The Aukam deposit, located in the //Karas Region about 200 km from Lüderitz, is a historic vein graphite mine that produced an estimated 22,000 tonnes of graphite between 1940 and 1974.

Operations ceased as global demand shifted, and the site remained dormant for decades.

In the early 2010s, the licenses covering Aukam were held by Next Graphite Inc., a US-listed junior company that struggled to advance the project due to a lack of funding. In 2014, Canadian-listed CKR Carbon Corporation (later renamed Gratomic Inc.) entered into a joint venture with Next Graphite to explore and redevelop the Aukam project.

By 2016, Gratomic had secured control of the licenses, including the coveted Mining License, and began positioning itself as the project operator.

Since then, Gratomic has partnered locally with Perpetuus Carbon Technologies and Namibian stakeholders, notably through the involvement of Helao Shivolo, who serves as in-country representative and government liaison.

The company also invested in exploration, bulk sampling, and construction of pilot processing facilities, confirming that Aukam’s graphite could achieve purities of 97–99% Cg, suitable for use in electric vehicle (EV) battery anodes.

Restart Plans

The latest mobilisation brings workers back to site to prepare the plant and mine for restart. The on-site team is led by Senior Geologist and Acting Mine Manager Raimund Rental and Namibian partner Helao Shivolo, with staff accommodated in housing previously built at Aukam.

Gratomic plans to mine 7,000 tonnes of ore, adding to the existing 3,000-tonne stockpile. This will bring the run-of-mine pad to capacity and provide feedstock for up to 12 months of processing.

The company is targeting first-phase production of 7,600 tonnes of finished graphite concentrate, with the installation of final components scheduled to achieve 97% Cg purity for late September 2025.

Meanwhile, Rental’s team is finalising a 10,000-metre drilling program due to commence in early 2026, designed to follow up on mineralisation identified in the 2022–2023 campaigns. The program will complete infill drilling required for a new NI 43-101 Technical Report and support the company’s planned Feasibility Study.

Financial Reporting and Corporate Challenges

The restart comes after a period of corporate difficulty. Gratomic fell behind on its mandatory financial reporting in 2024, prompting warnings from the Ontario Securities Commission (OSC) and the risk of a cease-trade order. In response, the company changed auditors from D&H Group LLP to McGovern Hurley LLP. All financial documentation has now been submitted, and the annual audit for December 31, 2024, is underway. Management has said it expects to file its outstanding audited financial statements “in the near term.”

During this period, Gratomic’s leadership, including CEO Manie Silver and Chairman Arno Brand, also agreed to forego executive compensation in an effort to reduce costs. The company disposed of non-core assets, renewed mining licenses, and pursued potential off-take agreements to maintain momentum.

Risks and Outlook

Gratomic has cautioned that its decision to pursue production at Aukam has not been based on a Preliminary Economic Assessment, Preliminary Feasibility Study, or Feasibility Study. To date, no mineral resources or reserves demonstrating economic viability and technical feasibility have been delineated. As a result, risks remain high regarding costs, recoveries, and achieving commercial-scale production.

The company is now working toward completing a Feasibility Study, which will determine whether the Aukam processing plant can be scaled up to a commercial facility.

Gratomic is a Canadian-headquartered graphite development company with projects in Namibia, Brazil, and Canada. Aukam is its flagship asset. Through its Namibian partnership and local representation, the company aims to position Aukam as a source of high-purity vein graphite for the global electric vehicle battery supply chain.

Share340Tweet212
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

June 25, 2026
South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

June 25, 2026
Rössing marks 50 years with N$37m investment in science and digital innovation hub

Rössing marks 50 years with N$37m investment in science and digital innovation hub

June 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In