• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, June 7, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Uncategorized

ReconAfrica to drill Naingopo well on PEL 73 in Namibia through October

by Editor
October 4, 2024
in Uncategorized
0
ReconAfrica has drilled beyond 2,400m at Naingopo well in Kavango Basin
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

ReconAfrica plans to drill at the Naingopo well through October before reaching total depth and will disclose well results after thoroughly analysing the logs and any obtained fluids.
The Naingopo well on PEL 73 aims to drill to a depth of approximately 3,800 meters or 12,500 feet and is expected to encounter five primary Otavi reservoir intervals targeting oil and natural gas.
The well would be a significant play-opening discovery, providing access to multiple drill-ready prospects.
The Naingopo well is targeting 181 million barrels of unrisked prospective light/medium oil resources, or 937 billion cubic feet of prospective natural gas resources, on a 100% working interest basis, based on the most recent prospective resources report prepared by Netherland, Sewell & Associates, Inc.
ReconAfrica CEO Brian Reinsborough says they have set the last casing point prior to drilling into the Otavi reservoir section.
He said they encountered slower drilling rates in the deeper section of the Mulden formation and experienced tight hole conditions while setting casing, which has caused delays to our original schedule.
“As part of the planned drilling program, we are switching out the blowout preventer to 10,000 psi ahead of drilling deeper intervals.
“Drilling will commence in the coming days, and we expect to penetrate the primary objective of the Damara Fold Belt play, the Otavi carbonate reservoir, soon after that,” Reinsborough said.
ReconAfrica is proceeding with construction operations before spudding the Kambundu exploration well (Prospect P).
This well is expected to spud in late November or early December 2024 following the completion of the Naingopo exploration.
Kambundu (Prospect P) targets 309 million barrels of unrisked prospective light/medium oil resources, or 1.6 trillion cubic feet of prospective natural gas resources, on a 100% working interest basis.
This is based on the most recent prospective resources report from Netherland, Sewell & Associates, Inc.
The company received the Environmental Clearance Certificate for a 3D seismic survey on PEL 73.
This program is expected to be acquired in the first quarter of 2025, targeting the prospective Kavango Rift Basin play.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe