• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, June 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Forsys to advance Norasa uranium project development after latest mineral resource estimate

by Editor
May 15, 2024
in Uranium
0
Forsys to advance Norasa uranium project development after latest mineral resource estimate
590
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Forsys Metals country director Pine van Wyk says the comprehensive work done over the last 12 months on the Norasa Uranium Project has created a solid foundation to advance project development. 

The Norasa Uranium Project, on farm Valencia 122 and farm Bloemhof 109, is owned by Forsys’ 100% subsidiary, Valencia Uranium (Pty) Ltd. 

Van Wyk commented after the company provided an update for the Norasa Uranium project, which comprises the deposits of Valencia Main and East under mining license 149) and Namibplaas under EPL-3638.

The mineral resources are reported within US$120/lb U3O8 pit shells, with a cut-off grade of 40 ppm U3O8 for each of the deposits at Valencia Main and East and US$120/lb U3O8 at 40 ppm U3O8 cutoff at Namibplaas.

The total deposits assessed for the overall Norasa project drilling results estimated the measured and indicated resources at 151.9 Mt at 136 ppm eU3O8, with contained metal oxide of 45.4 Mlbs U3O8 at Valencia Main. 

Inferred resources for the Norasa project are estimated to be 224.5 Mt at 86 ppm eU3O8, with contained metal oxide of 42.6 Mlbs U3O8.

The results from the recent remodelling of historical 2005-2011 drilling and recent 2023 drilling will help reinforce the Norasa project’s upside potential.

Forsys Metals says reinterpreting the previous database and utilising all available data and modern estimation approaches has improved the definition of the MRE, enabling more confident mine planning.

Van Wyk says the revised mineral resource model will help optimise the mine economics and process parameters. 

According to Van Wyk, results are expected soon from a column leaching test program currently being undertaken at SGS Laboratories in South Africa, which would establish the design basis of the planned heap leaching pads.  

“With the existing mining licence 149 permitted to commence mining, the large-scale Norasa project is well advanced to take advantage of the strong uranium sector fundamentals,” he says.

Mining licence 149 was converted from EPL 1496 on June 23, 2008, and is valid for 25 years from the date of issue by the Namibian Ministry of Mines and Energy and is renewable.

In April 2009, Valencia Uranium entered into a compensation agreement with the owner of the farm, Valencia 122, regarding Section 52 of the Minerals Act of 1992. 

The agreement granted Valencia Uranium unrestricted use of the land on and around mining licence 149, covering an area of 3,327 hectares. 

A similar agreement was reached with the owners of the neighbouring 594-hectare farm, Bloemhof 109.

Namibplaas is located 4.5km northeast of the Valencia deposit on the farm Namibplaas 93, with a total surface area of 1,269 ha.

 

 

Share236Tweet148
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Cazaly Resources starts drilling at Kaoko lithium project

Cazaly secures access to Cadix farm area, targets 3Q 2026 for maiden drilling at Abenab North

June 23, 2026
Tantalite Valley waiting for exploitation

Kazera agrees US$10.5m deal to end Aftan payment dispute

June 22, 2026
MUN embarks on nationwide engagement with workers

MUN embarks on nationwide engagement with workers

June 21, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In