• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, October 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Former Debmarine executive takes charge of Bannerman’s Etango uranium project

    Former Debmarine executive takes charge of Bannerman’s Etango uranium project

    Reviving the Moosehead in PEL 87

    Pancontinental’s Namibia oil drilling plans hinge on finding a partner

    Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

    Connected Minerals puts two Namibian uranium projects on hold

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    China secures 60% of Etango uranium production

    China secures 60% of Etango uranium production

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Otavi REE assets drive Cazaly’s recent trading level of A$0.032

    Cazaly identifies two copper drilling targets at Abenab North

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Prospect Resources expects drill results from Omaruru Lithium Project any time now

by Editor
April 30, 2024
in Lithium
0
Prospect Resources expects drill results from Omaruru Lithium Project any time now
615
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

Prospect Resources expects results from the phase 2 drilling at its Omaruru Lithium Project to be available soon.

The Omaruru Lithium Project, comprising EPL 5533, covers 132 square kilometres around the Wilhelmstal village, east of Karibib in Namibia.

The tenement is located near several advanced mining projects, including Osino Resources’ Twin Hills Gold Project (recently acquired by Yantai Gold) and Lepidico’s Karibib Lithium Project.

Prospect Resources became the 100% owner of the Omaruru project in March 2024 after acquiring the remaining 60% stake from Osino Resources’ subsidiary, Richwing Exploration.

The drilling program started in January 2024, targeting prospective geochemical anomalies at Karlsbrunn SE, Karlsbrunn NE, and Bergers Central.

The initial Phase 2 drilling plan consisted of about 70 rotary air blast (RAB) and reverse circulation (RC) drill holes, each extending for approximately 4,250 metres. 

The RAB drilling programme tested the full extent of the anomalous soil geochemistry, mapped the surface, and inferred the subsurface extents of the lithium-caesium-tantalum (LCT) pegmatite deposits. 

The program also targeted the root zone feeder system identified on the southeast flank of Karlsbrunn Main, which previously returned 35m @ 0.85% Li2O from the surface in August 2023.

Prospect Resources says the results will define key lithium-mineralised pegmatites’ geometry, depth, and strike extent. 

Additionally, the results will inform the generation of a more detailed and profound RC drilling programme targeted at a potential JORC-reportable lithium mineral resource estimate during 2024. 

Prospect Resources’ exploratory soil geochemical sample survey programmes completed in 2023 have outlined coherent anomalies of LCT pathfinder elements that, after drilling, have outlined highly encouraging intersections of lithium (e.g., >1% Li2O at Bergers) within concealed, ‘blind’ pegmatites.

According to Prospect Resources, Omaruru offers excellent potential for Prospect to delineate a maiden JORC-reportable lithium mineral resource and identify new deposits.

The tenement contains 60 visible outcropping LCT pegmatites, with historical artisanal workings for gemstones common throughout the tenement and considerable prospectivity for identifying further lithium-enriched deposits occurring below cover in the region.

 

 

 

 

Share246Tweet154
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Former Debmarine executive takes charge of Bannerman’s Etango uranium project

Former Debmarine executive takes charge of Bannerman’s Etango uranium project

October 29, 2026
Reviving the Moosehead in PEL 87

Pancontinental’s Namibia oil drilling plans hinge on finding a partner

October 29, 2026
Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

Connected Minerals puts two Namibian uranium projects on hold

October 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe