• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, June 9, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Snow Lake Resources completes Engo Valley Uranium Project’s 2024 exploration program

by Editor
April 8, 2024
in News
0
Snow Lake Resources completes Engo Valley Uranium Project’s 2024 exploration program
570
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Snow Lake Energy has completed planning for its 2024 exploration program on the Engo Valley Uranium Project, with exploration work scheduled to commence shortly.

The Engo Valley Uranium Project is on the Skeleton Coast, in the Opuwo District of the Kunene Region, along the coast of northwest Namibia, approximately 600 kilometres north of Swakopmund.

The project, under EPL 5887 and covering 69.530ha, is held by Namibia Minerals and Investment Holding (Pty) Ltd.

Snow Lake and a private British Columbia company entered into a binding letter of intent in February 2024 to acquire up to 85% of Namibia Minerals and Investment Holding.

The first phase of the exploration program includes an analysis of all airborne survey data flown by the Namibian government over the project area, including a radon cup survey of all historical targets and several new targets.

The Company wants to verify the historical airborne survey data and to confirm the drill target topographical survey of the project site, an initial 1.000–metre reverse circulation drill program to twin the historical drill holes, and to begin an in-fill grid pattern between the historical drill holes.

Additionally, Snow Lake will initiate the ground geophysics program, designed to confirm the historic airborne survey data, confirm historic ground geophysics data, guide our planned drill program, and identify new target areas for follow-up this April.

With the results of the first-phase program, Snow Lake will design a follow-up reverse circulation drilling program to continue in-fill drilling and test new targets identified during the program’s first phase.

The follow-up program will commence immediately after receiving the program’s first phase results.

Uranium mineralization was discovered on the project in 1973. Exploration was conducted intermittently by Gencor between 1974 and 1980, and based on that work, Gencor calculated a historical, non-current mining code compliant resource estimate for the project.

Snow Lake CEO Frank Wheatley confirmed that they completed designing the 2024 exploration program on the Engo Valley Uranium Project.

“We are very excited to commence exploration at this highly prospective project. Results from historical (non-SK-1300 compliant) work point to the potential of this project to host significant uranium mineralization.

“We are eager to confirm and expand on the historical work done as we work towards delineating an SK-1300 compliant mineral resource estimate. We are now finalizing contracts with our consultants and service providers and look forward to mobilizing to the site in the next couple of weeks.”

Share228Tweet143
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe