• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, November 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Namibia mining output falls 17% as Chamber warns of further contraction

    Namibia mining output falls 17% as Chamber warns of further contraction

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

    Aldoro deploys two rigs for 1,930m copper-gold drilling at Kalkfeld

    Haib placed third among major low-grade copper producers

    Haib placed third among major low-grade copper producers

    Okavango Diamond Company earns US$645 million from Botswana diamond sales

    Okavango Diamond Company earns US$645 million from Botswana diamond sales

    Jacaranda reports A$7.3 million cash to fund Botswana gold exploration

    Jacaranda reports A$7.3 million cash to fund Botswana gold exploration

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Critical Metals

Andrada confirms 9km mineralised system at Lithium Ridge after US$7m drilling campaign

by Editor
November 24, 2026
in Critical Metals
0
Uis Tin Mine’s measured resource tonnage increased by 30% to about 27.3 million tons
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has confirmed a nine-kilometre mineralised pegmatite system extending to depths of nearly 300 metres at its Lithium Ridge project in Namibia’s Erongo Region.

The company released its sixth and final batch of Stage 1 drilling results on 24 November 2026, concluding a 16,525-metre diamond drilling campaign comprising 143 holes funded by SQM International, one of the world’s leading lithium producers.

The results confirmed multiple stacked pegmatites containing high-grade lithium alongside persistent tin and tantalum mineralisation, supporting the potential development of a mining operation capable of generating revenue from three commodities.

The drilling programme was initially designed to cover 14,000 metres but was expanded by 18% to investigate the continuity of mineralisation at greater depths, structural thickening and newly mapped parallel pegmatites beyond the main ridgeline.

The final batch reported mineralised pegmatite intersections from 59 drill holes, providing additional geological information for exploration targeting, resource modelling and further development of the project.

Andrada chief executive officer Anthony Viljoen said the results demonstrated the scale, grade and structural continuity of the mineralised system.

“The release of the final batch of Stage 1 drill results marks a defining milestone for the Lithium Ridge project and our strategic partnership with SQM. Across 143 diamond drill holes comprising over 16,500 metres of core, our exploration team has been able to demonstrate the scale, grade, and structural continuity of a mineralised pegmatite system that extends for some 9km along strike.”

High-grade lithium near surface and at depth

The highest-grade lithium sub-interval in the final batch was recorded in drill hole LRD049, which returned 15.94 metres grading 2.20% lithium oxide from a downhole depth of 57.26 metres, including 2.96 metres at 3.07% lithium oxide.

The broader intersection also contained 0.16% tin and 75 parts per million (ppm) tantalum.

Another shallow intersection, in drill hole LRD047, returned 27.19 metres grading 1.08% lithium oxide, 0.15% tin and 58 ppm tantalum from 17.57 metres.

Drilling also confirmed substantial mineralisation at greater depths, with hole LRD126 returning 24.17 metres grading 1.30% lithium oxide from 264.58 metres, including eight metres at 1.67% lithium oxide.

Hole LRD113 returned 32.19 metres at 0.92% lithium oxide from 256.47 metres, including 4.71 metres grading 1.58% lithium oxide.

Another significant intersection, in hole LRD124, returned 32.07 metres grading 1.02% lithium oxide, 0.13% tin and 53 ppm tantalum from 137.24 metres.

“These final assays close out the drilling campaign on a high note delivering shallow, high-grade lithium intersections, while simultaneously proving that wide, well-mineralised pegmatites, some exceeding 30 metres in apparent width, persist to depths approaching 300 metres,” Viljoen said.

Andrada said the presence of multiple stacked, sub-parallel mineralised pegmatites supports the potential for bulk open-pit development in the upper sections of the mineralised system, while deeper intersections indicate that mineralisation remains open at depth.

The company cautioned that the reported intersections represent apparent widths rather than the true thickness of the mineralised bodies.

Three potential revenue streams

The drilling programme also confirmed widespread tin and tantalum mineralisation across the mining licence, potentially allowing Andrada to recover multiple critical minerals from a single operation.

Significant tin and tantalum intersections included 0.53 metres grading 1.41% tin and 374 ppm tantalum in hole LRD052, which also returned a separate intersection of 3.67 metres grading 0.41% tin and 136 ppm tantalum.

Hole LRD089 returned 2.06 metres grading 0.79% tin, while hole LRD106 intersected 2.56 metres grading 768 ppm tantalum.

Other notable results included 3.12 metres grading 594 ppm tantalum in hole LRD048 and 5.59 metres grading 0.27% tin and 381 ppm tantalum in hole LRD142.

Viljoen said Andrada could draw on its existing operational and metallurgical expertise at the nearby Uis mine.

“Equally compelling is the persistent tin and tantalum mineralisation across the licence. Leveraging Andrada’s established operational and metallurgical expertise from our nearby Uis Mine, the potential to produce multiple critical minerals from a single operation could significantly enhance future project economics.”

The company said the production of multiple revenue-generating commodities could improve the project’s economics and effective operating cost position, although this remains subject to further metallurgical testing and economic evaluation.

Defining the mineralised system

Seven drill holes either failed to intersect significant pegmatites or returned mineralisation below Andrada’s minimum reporting criteria of more than 0.25% lithium oxide, 0.1% tin or 99 ppm tantalum.

Rather than focusing exclusively on high-grade intersections, the drilling programme also sought to establish the structural and geological boundaries of the mineralised pegmatite system.

Andrada said the peripheral drilling results would allow its technical team to refine the three-dimensional geological model, strengthen geological confidence and improve future exploration targeting and resource modelling.

Sample preparation was undertaken by SA Labs Ithuba, while chemical analyses were conducted by UIS Analytical Services.

The technical findings and quality assurance and quality control procedures were reviewed by Professor Laurence Robb, who has more than 30 years of industry-related exploration and economic geology experience.

SQM’s US$7 million investment

Lithium Ridge is situated on mining licence ML133, approximately 35 kilometres southeast of Andrada’s flagship Uis mine, and is connected by road to the B2 highway in the Erongo Region.

The licence lies within the NaiNais-Kohero pegmatite belt and encompasses the historical TinTan mine.

The project is held by Grace Simba Investments and is being developed through a three-stage earn-in agreement between Andrada and SQM.

Under Stage 1, SQM funded US$7 million in exploration expenditure to earn an initial 30% interest in Grace Simba Investments, with the programme overseen by a joint development committee comprising equal representation from both companies.

The completion of the 143-hole drilling campaign provides the partners with a comprehensive technical dataset to support further development of Lithium Ridge.

Although the results establish the scale and continuity of the mineralised system, further metallurgical testing and economic evaluation will be necessary to determine the commercial viability of producing lithium, tin and tantalum from a single mining operation.

Share196Tweet123
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Uis Tin Mine’s measured resource tonnage increased by 30% to about 27.3 million tons

Andrada confirms 9km mineralised system at Lithium Ridge after US$7m drilling campaign

November 24, 2026
Giyani secures US$2.5m for K.Hill manganese project in Botswana

Giyani secures US$2.5m for K.Hill manganese project in Botswana

November 23, 2026
Tsodilo secures two-year renewal for Gcwihaba rare earth project in Botswana

Tsodilo secures two-year renewal for Gcwihaba rare earth project in Botswana

November 23, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe