• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Safi Silver receives third US$3m payment from Kombat mine sale

    Namibia targets 57% processed mineral exports by 2030

    Petroleum Bill passes second reading with 50 votes

    Midas clears key hurdle in Otavi copper project acquisition

    Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Diamond industry faces familiar slump, but recovery may be different this time

    Diamond industry faces familiar slump, but recovery may be different this time

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Government approves bp takeover of three Namibia oil licences

by Editor
October 2, 2026
in Oil & Gas
0
bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026
508
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The government has approved BP Namibia Energy’s acquisition of 60% interests in three offshore petroleum exploration licences, clearing the way for the energy major to take over operatorship of PEL 97, PEL 99 and PEL 100.

Eco Atlantic announced on 2 October that formal ministerial approval for the transfer and assignment of the interests was received on 1 October.

The approval moves the transaction, first announced in April, closer to completion and gives bp operatorship of all three licences in Namibia’s Walvis Basin.

Under the agreement, Eco will transfer a 60% participating interest in each licence to bp while retaining 25%. NAMCOR holds 10%, and local partners hold the remaining 5%.

bp will carry Eco’s retained interest through the current exploration phase, including the costs associated with the interests held by NAMCOR and the local partners. Eco will also receive US$2.7 million at closing.

The exploration programme includes seismic reprocessing on PEL 97 and the acquisition of at least 3,000 square kilometres of new 3D seismic data across PEL 99 and PEL 100.

The three licences cover substantial acreage in the Walvis Basin. PEL 97 covers Block 2012A, PEL 99 covers Blocks 2111B and 2211A, while PEL 100 comprises Blocks 2211B and 2311A.

The transaction had previously received approval from the Namibian Competition Commission, leaving ministerial consent as one of the key outstanding regulatory requirements.

If the partners enter the second renewal period in 2028 and commit to drilling, Eco can transfer a further 10% interest in each licence to bp. In return, BP would carry Eco’s remaining 15% interest in an exploration well, subject to a maximum carry of US$21 million per well on each licence.

The potential drilling carry could therefore reach US$63 million across the three licences.

Eco president and chief executive Gil Holzman described the ministerial approval as a significant milestone towards completing the transaction.

“Securing final regulatory approval for the farm down of our Namibian portfolio to bp is a significant milestone for Eco and brings us towards completing this landmark transaction,” he said.

Once completed, the deal will establish BP as operator of the three exploration licences while leaving Eco exposed to future exploration activity without having to fund its retained interest during the current exploration phase.

 

Share203Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Bannerman approves FID for Etango, targets 2028 for yellow cake

Bannerman approves FID for Etango, targets 2028 for yellow cake

October 23, 2026
African Critical Elements targets Karibib lithium production within three years

African Critical Elements targets Karibib lithium production within three years

October 22, 2026
Paladin spends US$11m building uranium stockpiles at Langer Heinrich

Paladin spends US$11m building uranium stockpiles at Langer Heinrich

October 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe