• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, October 12, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Why Elizabeth Bay keeps coming back from the dead

    Why Elizabeth Bay keeps coming back from the dead

    Australian company Gibb River Diamonds acquires greenfield uranium projects in Erongo and Kunene

    Permit uncertainty pushes Gibb out of Namibia uranium exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

    Forsys’ Norasa in the making

    Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

    Elizabeth Bay Mine in trouble again

    US$50m investment targets restart of Elizabeth Bay diamond mine

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Eureka gets N$12.9m development funding push

    ReeXploration plans Phase 2 drilling after a 16.7 m uranium hit at Eureka

    Hope and Gorob workforce reaches 130 as first ore nears

    Hope & Gorob starts commercial production, targets 9,000 tonnes in October

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Rare Earth Elements

Kendrick says 95% of Teufelskuppe rare earths amenable to established processing

by Editor
September 11, 2026
in Rare Earth Elements
0
Kendrick says 95% of Teufelskuppe rare earths amenable to established processing
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Kendrick Resources says more than 95% of the rare earth pool at its Teufelskuppe Carbonatite Complex in Namibia is in minerals amenable to established processing routes, as the company advances metallurgical work to determine how the deposit could eventually be processed.

The company said on Thursday that independent mineralogical analysis had confirmed that rare earth elements at Teufelskuppe are predominantly hosted in fluorocarbonate minerals, particularly bastnäsite and parisite, which are commonly associated with major rare earth deposits globally.

The findings follow a work programme announced in March to establish the project’s mineralogical and metallurgical characteristics ahead of future processing studies.

Bulk sample analysis found total rare earth mineral content ranging between 1.3% and 7.8%, with an average of 3.8%.

Kendrick said the mineralogy supports the potential application of established processing methods, although metallurgical testing to determine actual recoveries and develop a processing flowsheet is continuing.

Three bulk samples were submitted to German specialist Dorfner Anzaplan in August for early-stage metallurgical assessment and Mineral Liberation Analysis targeting light rare earth oxide recovery.

The Anzaplan programme uses representative samples from the principal structures within the Teufelskuppe carbonatite complex and is guided by the latest mineralogical work.

Kendrick also reported low concentrations of uranium and thorium, which it believes could reduce processing, environmental, and permitting complications commonly associated with rare earth projects.

Certified assays from SGS South Africa covering 96 samples from the northern suite of Teufelskuppe outcrops returned average thorium concentrations of 144 parts per million and uranium concentrations of 3.6 ppm.

The company said comparable hard-rock rare earth projects used in its benchmarking contain thorium concentrations ranging from 240 ppm to 2,900 ppm and uranium concentrations from 30 ppm to 360 ppm.

Kendrick chairman Colin Bird said the low radioactivity profile represented an important milestone as the company moves towards designing a processing flowsheet.

“The significance of the latest mineralogical and radioactivity results from certified assays showing the Bonya project to have thorium and uranium levels notably lower than global averages or that of many currently operating REE projects should not be overlooked since high content of radioactive elements has traditionally been a ‘Project Stopper’ or led to a requirement for very high cost (capex and opex) processing routes,” Bird said.

“This represents one of the three major milestones having been met and neatly leads into the design of a flow sheet that will have fewer complications not being burdened by high radioactivity levels.”

Kendrick said thorium and uranium can occur within rare earth mineral lattices and may have to be managed during processing as naturally occurring radioactive material.

The company expects to handle radiation protection and waste-management requirements at Teufelskuppe through standard industry practices, although detailed technical, environmental and permitting work remains ahead.

The latest work follows drilling results released by Kendrick earlier this month as it continues evaluating the scale of Teufelskuppe.

The company is targeting the development of a large light rare earth resource at the project, while the current mineralogical and metallurgical programmes are intended to establish whether the mineralisation can ultimately be processed economically.

.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Arcadia finds funding partners for Swanson Tantalum Mine

Arcadia turns to European financiers as Swanson-Xinhai deal remains unresolved

October 10, 2026
Why Elizabeth Bay keeps coming back from the dead

Why Elizabeth Bay keeps coming back from the dead

October 10, 2026
Australian company Gibb River Diamonds acquires greenfield uranium projects in Erongo and Kunene

Permit uncertainty pushes Gibb out of Namibia uranium exploration

October 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In