• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 16, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval allocates US$7.1m to Namibia copper exploration

    Madison Metals starts drilling at Khan Project in Namibia

    Critical One plans Critical Two Energy for Namibian uranium assets after failed US$3.5m sale

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast commits N$13.75m to uranium exploration near Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle finds uranium along 2.9km stretch near Trekkopje

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Noronex sees Powerline drill campaign as key toward commercial-scale discovery

    Noronex exits DorWit, its first Namibian copper projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Rare Earth Elements

Aldoro grows Kameelburg resource to 804.5Mt, containing 1.37Mt of critical rare earths

by Editor
August 4, 2026
in Rare Earth Elements
0
East Coast Research positions Kameelburg for Tier-1 status
506
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Aldoro Resources has expanded the Mineral Resource at its Kameelburg Rare Earth Element-Strontium-Niobium Project in central Namibia to 804.5 million tonnes, establishing what the company says is one of the world’s largest undeveloped rare earth projects and positioning it among the largest known inventories of neodymium and praseodymium (NdPr), the critical rare earth elements used in permanent magnets.

The updated independent JORC (2012) Mineral Resource Estimate, announced on 4 August, represents a 35% increase from the 597.1 million tonnes reported in May this year and follows the completion of the company’s Phase 1 and Phase 2 diamond drilling campaigns comprising 39 drill holes for 16,904 metres. The project is owned 85% by Aldoro Resources.

The revised estimate reports a total resource of 804.5 million tonnes grading 2.90% TREO equivalent, comprising 1.17% total rare earth oxides (TREO), 0.19% niobium pentoxide, 191 parts per million molybdenum and 0.17% neodymium-praseodymium (NdPr). It also includes the project’s first Indicated Mineral Resource, with 162.1 million tonnes upgraded into the higher-confidence category, while the remaining 642.4 million tonnes are classified as Inferred.

Aldoro estimates the deposit now contains approximately 1.37 million tonnes of NdPr oxide, exceeding the published contained NdPr inventories of Lynas Rare Earths’ Mt Weld deposit in Australia and MP Materials’ Mountain Pass operation in the United States on a contained oxide basis. The company said the comparison highlights Kameelburg’s emergence as a globally significant rare earth development project outside China.

The company also reported a higher-grade subset of 414.8 million tonnes grading 3.32% TREO equivalent, which it believes could support future open-pit mining of higher-grade material, subject to mining studies.

In addition to rare earth elements, Kameelburg hosts what Aldoro describes as the world’s largest strontium resource, estimated at 802.1 million tonnes grading 2.11% strontium, together with significant niobium mineralisation. Metallurgical test work has already demonstrated approximately 72% rare earth recovery, 99% strontium extraction and 62.4% niobium recovery, giving the project exposure to multiple critical mineral markets.

Chairwoman Quinn Li said the updated Mineral Resource represented a defining milestone in the company’s transition from explorer to developer.

“The updated Mineral Resource Estimate confirms Kameelburg as one of the world’s largest undeveloped rare earth projects, while the delivery of our maiden Indicated Mineral Resource marks the beginning of the next stage of value creation as we systematically advance the project towards development,” she said.

Li said the project’s unique mineralogy differentiates it from many conventional rare earth deposits because mineralisation is hosted predominantly in ancylite, together with strontianite and niobium-bearing minerals, rather than the more common monazite or bastnäsite minerals. She said preliminary metallurgical work suggests the potential for a simpler processing route using direct hydrochloric acid leaching without conventional beneficiation.

The company believes Kameelburg is well positioned to benefit from growing global demand for magnet rare earths driven by electric vehicles, wind turbines, industrial motors, defence technologies, data centres and the emerging market for humanoid robots and artificial intelligence-enabled automation. It noted that NdPr is an essential component in neodymium-iron-boron (NdFeB) permanent magnets, while the project’s substantial strontium inventory also provides exposure to the global ferrite magnet market, which accounts for more than 70% of permanent magnet demand by volume.

With resource definition now largely complete, Aldoro said its focus is shifting towards development. During the second half of 2026 the company plans to undertake upgraded hydrometallurgical test work in Johannesburg, complete a scoping study leading into a pre-feasibility study, commence Phase III drilling aimed at converting more Inferred Resources into the Indicated category and continue preparations for a proposed listing on the Hong Kong Stock Exchange to broaden access to international capital.

Located about 300 kilometres north of Windhoek and 60 kilometres southwest of Otjiwarongo, the Kameelburg Project benefits from existing infrastructure, including the sealed C33 highway, the TransNamib heavy-haul railway about 2 kilometres away, a 220-kilovolt transmission line approximately 7 kilometres from the project and the Port of Walvis Bay, about 355 kilometres to the southwest. Aldoro said these advantages could reduce future development costs as the project advances through feasibility studies.

Share202Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

October 16, 2026
Deep Yellow locks in water, local ownership ahead of Tumas investment decision

Deep Yellow postpones Tumas investment decision beyond 2026

October 16, 2026
Midas kicks off major drill campaign at Otavi Copper Project

Midas finds multiple high-grade copper zones at Deblin near Otavi

October 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In