• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, July 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Castrol changes ownership as bp streamlines business

    Castrol changes ownership as bp streamlines business

    Meren Energy says TotalEnergies has submitted Venus field development plan

    TotalEnergies secures approval for offshore licence swap

    Bannerman’s 16-year path to Namibia’s 4th uranium mine

    Approval for Chinese investment in Etango tied to jobs, local businesses

    Namibia Construction and Nexus Building win A$34 million Tumas contracts

    Namibia Construction and Nexus Building win A$34 million Tumas contracts

    Nandi-Ndaitwah proposes Angola-Namibia-South Africa power corridor

    Nandi-Ndaitwah proposes Angola-Namibia-South Africa power corridor

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle brings forward second uranium target after encouraging Namibia drilling

    ReconAfrica penetrates 400m hydrocarbon interval at Kavango West 1X

    ReconAfrica records first onshore hydrocarbon flow during Namibia production test

    Pancontinental sees over 20 billion barrels recoverable at PEL 87

    Pancontinental launches feasibility study to improve PEL 87 seismic data processing

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    South32 backs expanded copper hunt across Noronex’s Namibian projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Tantalum

Kazera agrees US$10.5m deal to end Aftan payment dispute

by Editor
June 22, 2026
in Tantalum
0
Tantalite Valley waiting for exploitation
505
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Kazera Global has agreed a US$10.5 million settlement with Hebei Xinjian Construction, bringing a long-running dispute over the sale of its former Namibian tantalum and lithium business a step closer to resolution and potentially unlocking total proceeds of US$14.6 million from the transaction.

The settlement follows a favourable arbitration ruling in Namibia last year after Hebei defaulted on payments linked to the 2022 acquisition of African Tantalum (Aftan), a mining operation with tantalum and lithium assets in Namibia.

As part of the agreement, Hebei is expected to make an initial US$500 000 payment from Namibia before 6 July, triggering a structured settlement programme that will run until December 2029.

The dispute dates back to December 2022, when Kazera sold Aftan to Hebei for approximately US$13 million. While Kazera received about US$4.1 million under the original agreement, further payments failed to materialise, prompting the company to launch arbitration proceedings in Namibia.

In May 2025, an arbitral tribunal ruled substantially in Kazera’s favour, awarding the company approximately US$11.9 million, plus interest and costs. Although Kazera remained confident of enforcing the award, the company said a negotiated settlement offered greater certainty and a clearer path to recovery than a potentially lengthy legal enforcement process.

Under the settlement agreement, Hebei will pay a total of US$10.5 million through a structured instalment schedule ending in December 2029. The agreement also allows Hebei to settle early through a discounted payment of US$9 million if the full amount is paid by 31 December 2026.

The settlement is structured around two components, comprising approximately US$7 million in shareholder loan repayments and US$3.5 million relating to the transfer of Aftan shares.

Importantly, Kazera will retain control of Aftan until aggregate payments of at least US$7.125 million have been received. Ownership will then transfer in four separate 25% tranches as payment milestones are reached, with all transferred interests pledged back to Kazera as security until the settlement has been fully discharged.

The company said the arrangement contains significant downside protection, including acceleration clauses and automatic unwind provisions should Hebei default on two payments.

Interim chief executive Richard Jennings described the agreement as a breakthrough following years of uncertainty surrounding the transaction.

“This is a significant and highly positive milestone for Kazera and its shareholders. We have executed a definitive settlement agreement in respect of the Aftan arbitration which provides a clear pathway to significant further value recovery,” Jennings said.

If completed in full, the settlement would bring Kazera’s total receipts from the Aftan transaction to approximately US$14.6 million, exceeding the original cash consideration agreed in 2022.

The company said the expected inflows would strengthen its financial position and allow management to focus on advancing its Namibian portfolio, including Whale Head Minerals, the REMI partnership at Walviskop and efforts to secure the strategic 2A Mining Right.

Kazera also indicated that, subject to legal, tax and regulatory considerations, it intends to return approximately 80% of net proceeds received under the settlement to shareholders.

 

Share202Tweet126
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Aldoro secures A$4.3 million through convertible notes for Kameelburg project

Aldoro secures A$4.3 million through convertible notes for Kameelburg project

July 21, 2026
Namibia Critical Metals approves C$11 million to design Lofdal processing plant

Namibia Critical Metals approves C$11 million to design Lofdal processing plant

July 21, 2026
Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

July 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In