• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Navachab welcomes 28 apprentices

    Navachab welcomes 28 apprentices

    Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate

    Engo Valley uranium project maiden resource set for mid-third quarter 2026

    Trigon’s smart exit – walks away with about US$25m net gain and a debt-free future

    New Horizon revives dewatering strategy at Kombat Copper

    Koryx Copper to raise N$26.6m from selling 16 million shares

    Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

    Omitiomire – Namibia’s next copper mine

    Appian Capital Advisory acquires 95% stake in Omitiomire Copper Project

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich increases production to 1.29 million pounds in last quarter

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica targets May start for Kavango West 1X production testing

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Engo Valley uranium project maiden resource set for mid-third quarter 2026

by Editor
May 18, 2026
in Uranium
0
Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate
494
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Frontier Nuclear and Minerals Inc. says it is on track to deliver a maiden mineral resource estimate for its Engo Valley uranium project in Namibia by mid-third quarter 2026 as the United States accelerates efforts to secure uranium supply for a major nuclear energy expansion programme.

The company said the upcoming maiden mineral resource estimate (MRE) will establish the foundation for future exploration and development work at Engo Valley, which Frontier believes could emerge as a strategic uranium asset in Namibia.

Frontier CEO Frank Wheatley said growing geopolitical tensions and energy security concerns were driving renewed investor interest in uranium projects located in stable mining jurisdictions such as Namibia.

“We believe current geopolitical and energy security trends are driving a re-rating of uranium assets in stable mining jurisdictions. A global focus on critical minerals needed to ensure energy and national security continues to underpin this re-rating,” Wheatley said.

He said the United States government was aggressively pursuing the development of all sectors of the nuclear fuel cycle while investing billions of dollars into building a secure domestic uranium supply chain.

“The maiden mineral resource estimate for Engo Valley is expected to establish the foundation for Engo Valley to potentially become a strategic uranium development asset in Namibia and we believe Engo Valley has the geologic potential to add to Namibia’s globally important uranium production,” Wheatley said.

The Engo Valley project is located in northwestern Namibia, a region increasingly attracting uranium exploration interest as global uranium demand strengthens amid renewed support for nuclear power.

Namibia is currently the world’s third-largest uranium producer and hosts major operations including Rössing Uranium Limited, Swakop Uranium’s Husab Mine and Paladin Energy Ltd’s Langer Heinrich Mine.

Frontier said all assay results from the Phase 2 drilling programme have now been received, allowing the company to finalise the maiden mineral resource estimate in accordance with Subpart 1300 of Regulation S-K standards.

The Phase 2 drilling campaign, completed during 2025, involved a total of 5,565 metres drilled across 57 drill holes targeting the MUO and D1 target zones.

The programme included 2,760 metres of reverse circulation drilling in 33 holes and 2,805 metres of diamond drilling in 24 holes.

According to the company, downhole radiometric surveys were completed on all drill holes using gamma spectrometer probes, while 1,237 samples were submitted for chemical assay analysis.

Frontier said uranium mineralisation remains open along strike at both the MUO and D1 target areas, suggesting potential for additional resource growth beyond the maiden estimate.

The company said the objective of the Phase 2 programme was to establish a sufficiently robust drilling database capable of supporting the maiden resource estimate for Engo Valley.

Gencor conducted historical drilling at the project in the 1970s, and Frontier is now combining historical exploration information with modern drilling and geological analysis.

While the maiden resource estimate is being finalised, Frontier said it is already planning the next phase of exploration at Engo Valley.

Future work is expected to include additional drilling at the MUO and D1 target areas, along with geological mapping and sampling across the northern and southern sections of the project, which were identified as prospective during a 2024 radon cup survey.

The company linked the growing strategic importance of uranium projects such as Engo Valley to recent U.S. policy shifts aimed at rebuilding domestic nuclear fuel supply chains.

Share198Tweet124
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

May 19, 2026
Navachab welcomes 28 apprentices

Navachab welcomes 28 apprentices

May 18, 2026
Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

Kazera flags growing interest in Namibia’s Aftan tantalum-lithium project

May 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In