• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, June 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Uncategorized

Andrada reports 5.8 times increase in tungsten grade from 0.24% to 1.45% at Brandberg West

by Editor
April 13, 2026
in Uncategorized
0
Andrada unlocks N$190m for Brandberg West development stage
517
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining Limited has reported a 90% mass reduction and a 5.8 times increase in tungsten grade from 0.24% to 1.45%, alongside recoveries of up to 91%, in initial ore-sorting testwork at its Brandberg West project in Namibia.

The company said the results, based on nine grab samples, also showed tin grades rising from 0.31% to 2.09% and copper from 0.73% to 2.81%, confirming the polymetallic potential of the historical mining area.

Andrada, which already operates the Uis tin mine, is advancing Brandberg West as part of a broader strategy to expand its portfolio of critical minerals, including tin, tungsten and copper.

“These results represent an important validation milestone in highlighting the economic potential of tungsten as a key critical metal at the Brandberg West project,” chief executive Anthony Viljoen said.

He added that the grades achieved from historical waste dumps are “significantly higher than the global average for tungsten deposits with corresponding high recovery rates,” reinforcing confidence in the project’s development potential.

The initial programme focused on material from previously mined waste and blast rock, indicating that discard and tailings could be brought into production more quickly due to their availability at the surface.

The testwork used sensor-based X-ray transmission (XRT) ore sorting technology, which the company said successfully identified and separated multiple metals simultaneously, producing high-value concentrate streams.

Beyond grade improvements, the 90% reduction in material volume is expected to lower transport and processing costs, potentially accelerating the route to production.

Brandberg West, located on EPL 5445, has historically been known for its tin, tungsten and copper mineralisation but remained underdeveloped.

The current testwork forms part of a multi-phase programme that includes evaluating historical waste, tailings and in-pit material, alongside planned drilling.

Andrada is advancing the project under a staged earn-in agreement with ACAM LP affiliate BWCAM Limited, which could invest up to US$51 million to earn up to a 49% stake in the project.

The company said larger-scale bulk sampling is planned to provide more representative results, as the initial 30kg grab samples are not sufficient to reflect average grades across the deposit.

The results position tungsten as a potential cornerstone metal at Brandberg West, amid strong global demand for critical minerals used in industrial and energy applications.

Share207Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Cazaly Resources starts drilling at Kaoko lithium project

Cazaly secures access to Cadix farm area, targets 3Q 2026 for maiden drilling at Abenab North

June 23, 2026
Tantalite Valley waiting for exploitation

Kazera agrees US$10.5m deal to end Aftan payment dispute

June 22, 2026
MUN embarks on nationwide engagement with workers

MUN embarks on nationwide engagement with workers

June 21, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In