• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, August 26, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Koryx hits 969m at 0.27% copper equivalent at Haib

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada hits 24 metres at 2% lithium at Lithium Ridge

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy on NSX from Wednesday

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

1, 500 working on site at Osino’s Twin Hills ahead of first gold next year

by Editor
August 6, 2026
in News
0
1, 500 working on site at Osino’s Twin Hills ahead of first gold next year
525
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Osino Resources says construction of its Twin Hills gold mine is progressing on schedule, with 1,500 people working on site each day as the company targets first gold production by this time next year while expanding employment, community investment and regional economic development.

Speaking during a panel discussion at the Namibia Mining Expo and Conference on Wednesday, Osino Resources country director Venna (Werner) Schuchmann said the company had moved into full-scale construction in June last year and was making steady progress on what he described as a world-class mining project.

“We started constructing the mine in earnest last year in June,” Schuchmann said, describing the construction site as “a playground for big boys with all the tools and machinery there.”

He said approximately 1,500 people are working on the project every day, with more than 60 contractors, as construction continues on the US$500 million development.

Schuchmann said the project is backed by Osino’s majority shareholder, China’s Shanjin International Gold, whose financial capacity and technical expertise have strengthened confidence in delivering the mine on schedule.

“We are really moving along and hopefully by this time next year we’ll have poured the first gold,” he said.

Once operational, Twin Hills is expected to employ at least 1,000 people directly, while generating significantly more indirect employment through suppliers, contractors and businesses across the Erongo Region.

Schuchmann said the mine’s economic impact would extend well beyond the operation itself.

“The multiplier effect, which we always talk about at the Chamber of Mines, job creation multiplied five or six times, the whole impact on Omaruru, Karibib and Usakos,” he said.

Beyond mining, Osino is investing in long-term community development programmes.

Schuchmann said the company is constructing a community centre in Karibib and supports 31 early childhood development centres in the surrounding area through a partnership with the Tobias Hainyeko Foundation, providing daily meals to about 1,000 children.

He added that the company’s Toro Trust will build 100 houses over the coming year for employees, benefiting surrounding communities.

“There are lots of little things which we’re very proud of,” he said.

Despite the progress, Schuchmann said regulatory delays remain one of the biggest challenges facing major mining investments in Namibia.

He said the pace at which regulators and public institutions make decisions can be frustrating, particularly during construction, when project schedules are tightly managed.

“The normal issues you have with dealing with the regulators, the public entities, is the speed of decisions,” he said. “In the end it always goes well, but the speed of execution is sometimes frustrating.”

Schuchmann urged Parliament to expedite the long-awaited Minerals Bill, saying the legislation would provide greater certainty for investors.

He also highlighted ongoing challenges with obtaining and renewing work visas for specialised foreign personnel required during construction.

According to Schuchmann, companies are often forced to repeat lengthy recruitment processes when renewing permits for experts who have already been working on projects for years.

“It’s really sometimes very frustrating for us to bring in, especially for a construction project, people from other countries,” he said. “We’ve actually now got the thing that some people have been here for two years. The visas need to be renewed and we need to go through the whole process of interviewing again, which just doesn’t make sense.”

He warned that delays in processing visas and permits can have direct financial consequences by disrupting commissioning schedules and delaying delivery of equipment and technical expertise needed to keep construction on track.

“In a construction project we’ve got a certain window to execute things without impacting the critical path,” Schuchmann said. “We need to make sure that our product gets to the market when we say it is going to.”

Looking ahead, Schuchmann said Namibia possesses the resources, partnerships and goodwill needed to unlock even greater mining-led growth.

“We are just too few to be poor,” he said, echoing President Netumbo Nandi-Ndaitwah’s message delivered earlier in the day. “We’ve got the resources, we’ve got the people, we’ve got everything there. If there’s goodwill from both sides, we can really work together and we can move mountains.”

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia targets 57% processed mineral exports by 2030

Namibia says Orange Basin must still earn investor confidence

August 26, 2026
Koryx hits 969m at 0.27% copper equivalent at Haib

Koryx hits 969m at 0.27% copper equivalent at Haib

August 26, 2026
Deep Yellow locks in water, local ownership ahead of Tumas investment decision

Deep Yellow locks in water, local ownership ahead of Tumas investment decision

August 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In