• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, October 7, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Elizabeth Bay Mine in trouble again

    US$50m investment targets restart of Elizabeth Bay diamond mine

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Eureka gets N$12.9m development funding push

    ReeXploration plans Phase 2 drilling after a 16.7 m uranium hit at Eureka

    Hope and Gorob workforce reaches 130 as first ore nears

    Hope & Gorob starts commercial production, targets 9,000 tonnes in October

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas extends T-13 west with 22.6m at 6.01% CuEq

    Keras targets early copper production from Kaoko portfolio

    Keras targets early copper production from Kaoko portfolio

    Hope and Gorob to make N$1.95b net profit

    Hope and Gorob targets first copper shipment in November

    Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

    Tschudi weighs 30,000t copper expansion as resource nearly triples

    Koryx targets November PFS for Haib after 48,000m drilling campaign

    Koryx targets November PFS for Haib after 48,000m drilling campaign

    African Pioneer lines up 720,000tpa Ongombo copper plant

    African Pioneer lines up 720,000tpa Ongombo copper plant

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Tin

Andrada delivers 1,036 tonnes of tin as Uis lifts output

by Editor
March 26, 2026
in Tin
0
Andrada Mining intersects 1.13% tin, 1.76% lithium oxide, and 281ppm tantalum at Uis Mine
530
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining produced 1,036 tonnes of contained tin for the year ended 28 February 2026, up from 932 tonnes the previous year, as output from its Uis mine continued to improve.

The company processed 1,042,299 tonnes of ore, up from 965,058 tonnes in FY2025, while the plant ran at an average of 146 tonnes per hour, up from 136 tonnes per hour a year earlier.

Tin concentrate production rose to 1,740 tonnes, from 1,507 tonnes, while contained tin increased by 11% year-on-year. Recovery rates held at 72%.

In the fourth quarter, ore processed reached 255,320 tonnes, with plant throughput increasing to 153 tonnes per hour.

Contained tin output rose to 271 tonnes, up from 228 tonnes in the same period last year.

Tin concentrate production for the quarter increased to 453 tonnes, compared with 379 tonnes a year earlier, supported by higher feed grades, improved throughput and recovery.

Tin prices strengthened during the period, reaching about US$55,000 per tonne toward the end of the financial year.

At Brandberg West, Andrada concluded a US$51 million phased investment agreement with ACAM LP, with an initial US$10 million received to fund early-stage work, including feasibility studies and pit optimisation.

Historical drilling at the project returned grades of up to 10.55% tin, 3.53% tungsten and 1.95% copper.

At Lithium Ridge, early drilling under an earn-in agreement with SQM confirmed lithium mineralisation of up to 3.02% Li₂O, alongside tin and tantalum.

At Uis, the company secured up to €2 million in funding from the European Investment Bank to support lithium integration studies.

Andrada also revised its tin offtake agreement with Thailand Smelting and Refining Co Ltd (Thaisarco), which includes a US$3 million prepayment, repayable against future deliveries.

Chief executive Anthony Viljoen said the fourth quarter marked a defining period for the company.

“The fourth quarter has been a defining quarter for Andrada. We are delivering on our long-term strategy of consolidating highly prospective historic mining assets, attracting world class partners to accelerate their development, at a time of record commodity prices and immense strategic significance for our critical minerals portfolio,” Viljoen said.

Share212Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada targets full transformation of Uis plant within six months

Andrada targets full transformation of Uis plant within six months

October 7, 2026
Elizabeth Bay Mine in trouble again

US$50m investment targets restart of Elizabeth Bay diamond mine

October 7, 2026
Andrada finds high-grade lithium beyond the main Lithium Ridge trend

Andrada finds high-grade lithium beyond the main Lithium Ridge trend

October 6, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In